What your doing sounds fine, considering the Bigfoot is probably overkill for this application. It sounds like the material is what we would call a road gravel in my area. The only possible problem with it is that the material isn't washed at the pit, & generaly has some silt & dirt left in it, which in turn can weaken the concrete. It seems that your mixing about a 5 bag or 3000 psi mix, which is generally adequate for this, but you may want to add an extra half a bag of Portland to help make up for the "dirty" aggregate.