Hi all,
10 or more years ago I opened up the wall between my living & kitchen, it's the main Load Bearing wall running down the center of my house. It's an 8' opening and if I remember correctly I made the beam of either 2x10's or 2x12's with a 3/4" plywood section glued between the two. Pretty sure it was overkill at the time.
Because of recent kitchen updates I want to remove the last 34" of this wall on the right side of the picture all the way to the wall on the right side of it.
My question is can I Splice/Extend the existing beam that remaining 42" or so to set it on top of the right wall. I'm old an lazy now and remolding the kitchen recently has about killed me, so I would love to not have to redo the entire 12' span if I didn't have to. :vs_worry:
Is there a legit way to do this or just bite off the 12' redo?
Thank you.
10 or more years ago I opened up the wall between my living & kitchen, it's the main Load Bearing wall running down the center of my house. It's an 8' opening and if I remember correctly I made the beam of either 2x10's or 2x12's with a 3/4" plywood section glued between the two. Pretty sure it was overkill at the time.
Because of recent kitchen updates I want to remove the last 34" of this wall on the right side of the picture all the way to the wall on the right side of it.
My question is can I Splice/Extend the existing beam that remaining 42" or so to set it on top of the right wall. I'm old an lazy now and remolding the kitchen recently has about killed me, so I would love to not have to redo the entire 12' span if I didn't have to. :vs_worry:
Is there a legit way to do this or just bite off the 12' redo?
Thank you.
Attachments
-
127.2 KB Views: 651