Ok, my next step is to sit down with a builder and discuss my plan. However, I'd like to know if my plan is even viable. I don't want to look like I have my thumb jammed up my nose. I am looking to start a business that would require a 4200 square foot building. I'm leaning towards steel due to the simplicity of the structure and cost effectiveness. Included in that footage is a 900 sq ft office area in the front and a 75 sq ft 1 stall bathroom. The rest would be a straight wall building with one small storage side room. I have $200,000 available for construction after all other planned business expenses.
Minus the office, the rest of the building would be rather simple. A standard amount of windows. 3 exterior doors. Insulated. Ac/Heat. Electricity and plumbing. Lighting.
The office and bathroom would be dry walled with trim work. The rest of the building wouldn't need dry wall.
There is no slab, so that would have to be poured. Am I even remotely close to being in the ball park with $200,000? This would be located in Wisconsin.
I know there are significant variables, but I hope I was clear enough to get a VERY rough estimate.
I want to hear "you're crazy for thinking you can get that done for 200,00!" or "That's reasonable". I just don't want to look crazy to the builder when I sit down with him
Minus the office, the rest of the building would be rather simple. A standard amount of windows. 3 exterior doors. Insulated. Ac/Heat. Electricity and plumbing. Lighting.
The office and bathroom would be dry walled with trim work. The rest of the building wouldn't need dry wall.
There is no slab, so that would have to be poured. Am I even remotely close to being in the ball park with $200,000? This would be located in Wisconsin.
I know there are significant variables, but I hope I was clear enough to get a VERY rough estimate.
I want to hear "you're crazy for thinking you can get that done for 200,00!" or "That's reasonable". I just don't want to look crazy to the builder when I sit down with him