Joined
·
17,239 Posts
My concrete guy who can pretty much do anything had a free day so I put him to work doing some tasks that I had been avoiding (I hate heights)....I had install some blocking on the eaves of my house.....
In a couple of places I have what looks to be about a 1/4" gap between the block and the rafter.
Is that too much to fill with caulk or should I replace the 2-3 boards that are like this?
In a couple of places I have what looks to be about a 1/4" gap between the block and the rafter.
Is that too much to fill with caulk or should I replace the 2-3 boards that are like this?