The foundation is about 3' up all around the fist level of our split level and I want to frame it out and drywall it but I've found that it's not even close to level and parts of the wall are higher than others etc. What's the best way to build this wall up so that it's level with the outside wall that exist? Can I shim it up so it's level?
This picture is my first attempt at create a well section. Just for this 4' section I had to use 8 shims and all parts of the wall were different heights. The wall is not attached yet I'm trying to figure out the best way to do that too. I'm going to put some foam board between the concrete and studs too.
I'm using 2x4's so I can put in outlets along the wall too.
This picture is my first attempt at create a well section. Just for this 4' section I had to use 8 shims and all parts of the wall were different heights. The wall is not attached yet I'm trying to figure out the best way to do that too. I'm going to put some foam board between the concrete and studs too.
I'm using 2x4's so I can put in outlets along the wall too.
Attachments
-
98.2 KB Views: 24,024
-
97.2 KB Views: 20,539