Joined
·
336 Posts
I'm having a hard time getting an excavator to actually show up to do the above work. I know part of the procedure is to break up the bottom concrete for drainage. My question is, how broken up should it be? Does it really need to be fractured all over or would several say 1/2 inch holes drilled every few feet be acceptable?
If I rent equipment to break up the deck and side concrete myself (Bobcat or similar?) I don't believe there is any way it will reach to the pool bottom. Would Bobcat sized equipment do the job of breaking up the decking and pool sides or would something bigger be needed? Not sure what attachments etc would be necessary. Never operated anything in this class of machinery. A few years back I saw a walk behind piece of hydraulic equipment at a rental place and wonder if something like that would be suitable.
If I rent equipment to break up the deck and side concrete myself (Bobcat or similar?) I don't believe there is any way it will reach to the pool bottom. Would Bobcat sized equipment do the job of breaking up the decking and pool sides or would something bigger be needed? Not sure what attachments etc would be necessary. Never operated anything in this class of machinery. A few years back I saw a walk behind piece of hydraulic equipment at a rental place and wonder if something like that would be suitable.