Got the job done, after tearing out a few more holes Finally got to trace out each cable. Was a tricky one, The jobs was in a mini mall, and of course there was no one panel per store. Due to stores coming and going and/or expanding by taking over space next door there could be several stores pwr shut off's on one panel. Could not do job after stores hrs and disconnect pwr due to the fact there could be security line tied in to a breaker I need to turn off.And During stores hrs there were breakers with cashes and pc on it. Bet they love to get half way thru checking in and Power shut off..lol, After locating each line and the termination in panel. Shut one breaker off at a time and chk with storer to see what they lost, then rerouted pwr so they can continue business as I repaired the line. Had to do this for each of the 7 lines. Hr job took Several due to running aroung the dam mall.. lmao
Thanks for suggestions
~DPPEW~
By the Way DPPEW is short for DESPISE PIZZ POOR ELECTRICAL WORK, Take an extra second and DO IT RIGHT!!!