I am a week and 2 days from starting a full on assault on my basement! Picked up the permits to start work a couple of weeks ago and it's time to get cracking. It's currently completely unfinished (save for the stairs where they did frame and sheetrock to the inside of the stairwell). Next Thursday we're having a concrete cutting guy come out and make us a rough opening for a french door. There's already a 28" door there and it's on the backside of the house with the first floor joists sitting perpendicular to that wall. While he's there, he's also going to notch the poured foundation wall above the intended opening to slide a lintel in (which makes me feel better).
I'm going to have him cut the opening to allow for the width of the door, plus a pressure-treated 2x10 on each side (that will be attached to the concrete with masonry screws), plus a 1/4 inch on each side to allow for adjustment.
I'm getting one of those pre-hung french doors from Lowe's or HomeDepot. Nothing fancy, but with the blinds built into the glass.
Anything sound strange so far?
I'm going to have him cut the opening to allow for the width of the door, plus a pressure-treated 2x10 on each side (that will be attached to the concrete with masonry screws), plus a 1/4 inch on each side to allow for adjustment.
I'm getting one of those pre-hung french doors from Lowe's or HomeDepot. Nothing fancy, but with the blinds built into the glass.
Anything sound strange so far?