i'm putting a bathroom in my basement. there is an ejector pit with a Wayne macerator pump in it but no rough in for the toilet. The back of the toilet is going to be positioned 8" from the pit. What would be wrong with getting a rear exit toilet and running the soil line above the floor and into the top of the pit cover. I have read thru previous strings on this subject. They generally get negative response but are for longer runs. I can't see breaking up the concrete for such a short run. if there are pitfalls with this approach, perhaps I could avoid those in another way than breaking up the concrete. as you can tell this is my first basement job but I've done a number of smaller projects. Any thoughts would be appreciated.