I enjoy doing projects myself and have recently undertaken a big one. I am finishing my basement. I figured I would start with the bathroom since that involved removing portions of the slab and installing a sewage ejector pump (my main sewer line is 8' above the basement floor). I have already removed the concrete and have the pump where I would like it, but am uncertain exactly how the venting should work. After reading through these forums I understand the basics of what size drain and vent lines are necessary ... I'm just not sure if my plan is best suited for the fixtures I have. I am attaching a very basic drawing with how I am planning on laying out the drain lines and vent lines.
Any suggestions would be GREATLY appreciated! I live in Atlanta, GA, so if anyone has any experience with code in or around the area ... let me know (my calls to the building department have gone unreturned).
Thanks so much!
Any suggestions would be GREATLY appreciated! I live in Atlanta, GA, so if anyone has any experience with code in or around the area ... let me know (my calls to the building department have gone unreturned).
Thanks so much!
Attachments
-
89.2 KB Views: 130,516