Guys, I'm putting in a bar out of cabinets in my slab floor basement. The bar top will have a raised 2x4 wall with stone 2x10 end caps on each side. Over many months of thought I've decided to go with a glue down engineered flooring around the bar. My question is do I lay the flooring, then build my wall and end caps on top of the glued down flooring ramsetting or tapconing them through the the flooring into the concrete, or do I put my wall and end caps directly on the concrete and ramset them into the concrete and lay the flooring around the pressure treated lumber? Any help would be appreciated
Mike
Mike