I am installing new drains and will be pouring concrete over all when finished.
What is the best way to do the toilet flange, shower, floor drain and sink drain.
I would like to keep everything flush so I can screed the concrete over everything. Then install after.
Can I put some kind of cap over things and chip out after?
I will be putting tile down over the concrete.