I have a small laundry room addition 8x8 on the back of my cottage. Concrete slab at ground level, so the siding is also down to the ground. There is a lot of rot that was fixed half-axx. I am taking off the siding and fixing it right. What would you do to the area near the ground.
I could use several pressure treated 2xs stacked to make the sill plate 4-6" up.
I could make a 2-3 row brick base that the siding comes down to meet.
I could use pressure treated 2xs and put back as built.
What would you do?
Not a great picture, best I have.
I could use several pressure treated 2xs stacked to make the sill plate 4-6" up.
I could make a 2-3 row brick base that the siding comes down to meet.
I could use pressure treated 2xs and put back as built.
What would you do?
Not a great picture, best I have.