Joined
·
132 Posts
Hi guys. I am certainly no expert in HVAC and was hoping you guys could point me in the right direction (websites/books/etc) to gain a little bit of knowledge.
I have a 1750 sq ft. house and am adding about 550 sq ft in the basement below grade. I have forced air/ac and want to add some duct-work and just branch of my existing lines. I have already framed/insulated the basement and even with the temperature outside in the single digits in upstate NY my basement is currently only 2 degrees cooler that the rest of the house (and the basement currently has no heating registers) and during the summer the basement temperature was the same if not cooler.
The basement consists of one big family room of 400 sq ft and one bedroom of 150. Considering my basement already is so close to the whole house temp, could I get by with 2 4" round ductlines to the main room and one 4" duct to the bedroom? Or should I go 6"? Each room with a return equal to a 6" pipe? I know there is alot of math to this all but I am hoping someone can point me in the right direction to figure out if I can branch of my existing line or if I should upgrade that, etc. Thanks for all the tips.
Nick
I have a 1750 sq ft. house and am adding about 550 sq ft in the basement below grade. I have forced air/ac and want to add some duct-work and just branch of my existing lines. I have already framed/insulated the basement and even with the temperature outside in the single digits in upstate NY my basement is currently only 2 degrees cooler that the rest of the house (and the basement currently has no heating registers) and during the summer the basement temperature was the same if not cooler.
The basement consists of one big family room of 400 sq ft and one bedroom of 150. Considering my basement already is so close to the whole house temp, could I get by with 2 4" round ductlines to the main room and one 4" duct to the bedroom? Or should I go 6"? Each room with a return equal to a 6" pipe? I know there is alot of math to this all but I am hoping someone can point me in the right direction to figure out if I can branch of my existing line or if I should upgrade that, etc. Thanks for all the tips.
Nick