I'm wiring my basement and have a run for 20 amp service and have 20 amp outlets all ready to go. However, at the end of the run I was planning on pulling service to feed a light and switch ... Do I need anything special? Can I do that?
Actually, I'm sitting at about 12 amps right now on the circuit, so was going to go 20 amp just to make sure I was clear for the receptacles but wasn't sure about tying in a light an switch.rjniles said:Actually all your switches and receptacles in the described circuit only need be 15 amp. 20 amp is OK but it is more money. If the basement is not finished you need GFCI protection, if finished you need AFCI in most jurisdictions. Check with the inspector before you get too deep.
This is the bar area and yes ... The additional light isn't the concern, I was more concerned about the switch and such ... If I had to get anything special to run it on a 20A circuit.rjniles said:A 100 watt light will add less than 1 amp. 12 amps is a heavy load for a few receptacles, what is (or planned) to be plugged in?