Hi - my first post here and I really appreciate all the good information everyone has contributed.
I thought I'd start a new thread to post progress on our "home project" that starts... tomorrow! My wife and I just purchased a foreclosed home in San Diego (north county) and it closes tomorrow. Someone had already started doing some work to it (removed popcorn ceiling, etc), but it still needs a lot of work. Plus we're going to be making some fairly big changes.
This is my first significant "home" project. I've worked on cars and motorcycles a lot, so we'll see how quickly I can pickup new skills. For my day job I manage software projects, and I understand how quickly time lines and budgets can get out of control.
Summary of our plans (and photos below):
- remove wall separating kitchen and "tv room"
- add back 4th bedroom that was removed (to be an office)
- new floors in entire house
- new electrical panel and a number of "smallish" electrical projects
- new counter tops, but keep the cabinets in the kitchen
- build an island for the kitchen
- more...
So... I'd appreciate any feedback anyone has.
- Thoughts on our design? Any other ideas?
- We don't need to get everything done before we move in, but are going to try and get it as live-able and clean (for our 3 month old baby) in 2.5 months as possible. Is that a crazy time frame?
- I plan on working/helping as much as possible (I'm currently only working 2 days a week so have time to spend on this), but are also going to bring in "experts" (or someone who has done it before) for the big electrical work and time consuming stuff like tile and wallboard. Any thoughts on how much of this we should try to do ourselves, and how much we should just hand over to the experts?
That's it for now...
-Steve
I thought I'd start a new thread to post progress on our "home project" that starts... tomorrow! My wife and I just purchased a foreclosed home in San Diego (north county) and it closes tomorrow. Someone had already started doing some work to it (removed popcorn ceiling, etc), but it still needs a lot of work. Plus we're going to be making some fairly big changes.
This is my first significant "home" project. I've worked on cars and motorcycles a lot, so we'll see how quickly I can pickup new skills. For my day job I manage software projects, and I understand how quickly time lines and budgets can get out of control.
Summary of our plans (and photos below):
- remove wall separating kitchen and "tv room"
- add back 4th bedroom that was removed (to be an office)
- new floors in entire house
- new electrical panel and a number of "smallish" electrical projects
- new counter tops, but keep the cabinets in the kitchen
- build an island for the kitchen
- more...
So... I'd appreciate any feedback anyone has.
- Thoughts on our design? Any other ideas?
- We don't need to get everything done before we move in, but are going to try and get it as live-able and clean (for our 3 month old baby) in 2.5 months as possible. Is that a crazy time frame?
- I plan on working/helping as much as possible (I'm currently only working 2 days a week so have time to spend on this), but are also going to bring in "experts" (or someone who has done it before) for the big electrical work and time consuming stuff like tile and wallboard. Any thoughts on how much of this we should try to do ourselves, and how much we should just hand over to the experts?
That's it for now...
-Steve
Attachments
-
38.5 KB Views: 286
-