Hey everyone, I have a need to run a pvc water pipe, two pex radiant tubes, and a run of pvc conduit through a two hour fire wall. The wall is (actually will be) 8 inch zee channel girts with fiberglass insulation and two sheets of 5/8" sheet rock on both sides. What is the right way to to keep the 2 hour integrity with these pipes?