I am finishing the basement and putting up a stud wall in front of the concrete walls. Was planning 2x4's 24" o.c. with 1/2"drywall. The inspector said I needed either 16" o.c. studs or 5/8" drywall. I'm not sure if he was giving friendly advice or telling me what the code required.
Any advice??:wink:
Any advice??:wink: