DIY Home Improvement Forum banner
curing
1-4 of 4 Results
  1. Building & Construction
    Hi. This is my first post here. I'm a 2nd year carpentry apprentice Located in Montreal. I'm currently in the process of building our family cottage and I joined this community for construction advice. I'm almost done with building the forms, and next I'll be laying 4 inches of rigid insulation...
  2. Concrete, Stone & Masonry
    Hello! This is a new house, radiant heat embedded in 3 floors of 3.5-4" concrete. It was cured 2.5 months in dry, low humidity weather (a few spring rainstorms but generally 30-45% humidity) and water finish was applied. The pouring concrete crew was different than the sealer crew. Prior to...
  3. Concrete, Stone & Masonry
    Hi! After going through the new construction process for over a year, I know when things don't look right. :vs_worry: I recently moved into my new home and we are currently having our driveway poured. Last week when our pads were poured, they dried two different colors. In the picture, the...
  4. Concrete, Stone & Masonry
    I poured a small 50 sqft walkway 2 days ago but now won't be home to keep it damp for proper curing for at least 2 weeks. Because sprinklers or plastic covering are not viable options for me at this point, I was thinking of adding a skim coat with no intention of having it bond to the existing...
1-4 of 4 Results
Top