1-5 of 7 Results
  1. Plumbing
    I contracted a company to replace my drain field, they gave me a contract of $4200 to replace my field. They wrote in "Price subject to change if OCHD requires extra work then listed above. Dirt out $450 a load , dirt in $450 a load." When they got the required size of drain field they came...
  2. Remodeling
    This is probably too long but I'm ocd about being thorough if I'm just at a complete loss for comrehending things above my skill level LMAO! My basement was half finished poorly as a cover up job.1x3 furring strip with liquid nails wood glue to block, no vapor barrier or insulation, 1/4 inch...
  3. Roofing/Siding
    Hi! Recently joined this forum to get some advice. I met up with this contractor to get a re-roof and the fascia fixed/replaced. I gave the guy $1,000 to buy the materials. It's been more than two weeks and the materials have not been delivered nor has any tear down started. The original job...
  4. Concrete, Stone & Masonry
    I'm in the process of submitting bids for replacing the concrete floor in my basement and wanted to get some advice on what to put in the contract/bid specification: I'm replacing it for two reasons: 1. To gain additional height (to get to habitable height); and 2. To reduce the amount of...
  5. General DIY Discussions
    Hi everyone- I've been around here for a bit but this is my first post and I really hope someone might have knowledge they might share with me. Basically I started working with an unlicensed contractor and executed 3 agreements with him. One of interior work, another for a fence, and one last...
1-5 of 7 Results