Electrical
I am upgrading from a 150A main overhead to a Underground 400A service. I already have the new meter enclosure from the utility, and am trying to plan the setup. From the 2 lugs on the meter I planned to run into a 400 A disconnect then out of this into the supply side of 2 200A disconnects. One...