Timeline for Bathroom Remodel


My wife is 7 months pregnant and I wanted to get a bathroom remodel done before the baby comes. We already have a 3 year old so I figured it would be better to remodel the kids bathroom before #2 comes along. The plan was to start earlier but life got in the way...and here we are.

My plan is to take 3 weeks off work for a total of 23 working days to get it done. For you DIYers that have done this before, is timeline way too aggressive?

My other option is to wait 1 year or more for the the kids to be 4 and 1 and do the remodel then. I figured it would be easier to do it now with 1 kid instead of 2. This is a second bathroom so we can all use the master bath during the remodel.

I know there are too many variables to definitively say for sure but I figured I could at least get a reality check.

Scope:
go down to studs, new tub, tile shower walls, tile floor with new subfloor, current tile is on plywood, new vanity, new lighting

My skills:
I have done everything involved before except installing a new tub. I have all the tools required except a wet tile saw which I will buy

My help: my dad and brother in law can come help out, they have helped me in other projects but are not skilled enough to do things on their own







jmvar44 is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 01-24-2018, 08:50 PM   #2
Super Moderator
 
Gymschu's Avatar
 
Join Date: Dec 2010
Location: Eastern Ohio (heart of Appalachia)
Posts: 6,409
Rewards Points: 6,756
Default

Re: Timeline for Bathroom Remodel


Your pics aren't showing up. Your timeline is doable. I did my bathroom about 3 years ago. Gutted it in a day. Drywall and finish took about 3 days. Plumbing and electrical took another 3 or 4 days. I tiled the floor and that took some time as I had to level it all, install the cement board, install the tile, grout.....anyway, by myself and not working on it real steady, it took close to 3 weeks. With help, you can cut that time down as it sure helps to have extra hands installing the bath/tub enclosure, the toilet, the vanity, etc.
__________________
"In the heat of battle, my father wove a tapestry of obscenity........."
Gymschu is online now   Reply With Quote
Sponsored Links
Advertisement
 
Old 01-24-2018, 08:53 PM   #3
Newbie
 
Join Date: Nov 2013
Posts: 19
Rewards Points: 46
Default

Re: Timeline for Bathroom Remodel


Quote:
Originally Posted by Gymschu View Post
Your pics aren't showing up. Your timeline is doable. I did my bathroom about 3 years ago. Gutted it in a day. Drywall and finish took about 3 days. Plumbing and electrical took another 3 or 4 days. I tiled the floor and that took some time as I had to level it all, install the cement board, install the tile, grout.....anyway, by myself and not working on it real steady, it took close to 3 weeks. With help, you can cut that time down as it sure helps to have extra hands installing the bath/tub enclosure, the toilet, the vanity, etc.
I think the forum is resizing the pics and maybe that is why they are not showing up.

Did you work on it day to day consistently for 3 weeks or was it more when you got some time?

Thanks for your input.
jmvar44 is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 01-24-2018, 09:00 PM   #4
Super Moderator
 
Gymschu's Avatar
 
Join Date: Dec 2010
Location: Eastern Ohio (heart of Appalachia)
Posts: 6,409
Rewards Points: 6,756
Default

Re: Timeline for Bathroom Remodel


It was day-to-day. Some days, 3 or 4 hours, weekends 8-10 hours. I guess what throws off your timeline are the little surprises that hit you such as a floor out of level, re-doing plumbing that you hadn't planned on, walls needing shimmed because they are not plumb and level, and, for me, I had to make my own vanity because I couldn't find a style I liked in the size I needed. If you don't get too many of those "surprises" and you have some skills, you can move along pretty fast.
__________________
"In the heat of battle, my father wove a tapestry of obscenity........."
Gymschu is online now   Reply With Quote
Old 01-24-2018, 10:02 PM   #5
Peace be with you
 
DR P's Avatar
 
Join Date: Dec 2017
Location: in hills of Caroline USA
Posts: 933
Rewards Points: 1,860
Default

Re: Timeline for Bathroom Remodel


& pray that baby doesn't arrive early...we've been blessed with 2 preemie granddaughters; evidently they were both too impatient to wait till due dates... now that I've mentioned it... thinking positive thoughts...

Peace
DR P is offline   Reply With Quote
Old 01-25-2018, 05:17 AM   #6
Naildriver
 
chandler48's Avatar
 
Join Date: Jun 2017
Location: Young Harris, Georgia
Posts: 6,625
Rewards Points: 3,612
Default

Re: Timeline for Bathroom Remodel


I"m not a DIY'er, but you are up against too many variables (impatient babies for one) to make a solid timeline work. Too many "what ifs". If the bathroom(s) are usable, then I would wait until the dust settles a little so you won't have too many life happenings at one time. Your time line otherwise is doable.
CrazyGuy likes this.
__________________
Larry......
Half of Communications is Listening, and You can't Listen with your Mouth.
chandler48 is offline   Reply With Quote
Old 01-25-2018, 04:02 PM   #7
Usually Confused
 
lenaitch's Avatar
 
Join Date: Feb 2014
Location: Central Ontario, Canada
Posts: 4,894
Rewards Points: 2,018
Default

Re: Timeline for Bathroom Remodel


And don't forget to allow for any permit inspections. Some building departments are not that quick and, depending on the inspection, other work may be held up.
__________________
_________________________________________
Who Dares Wins
lenaitch is offline   Reply With Quote
Sponsored Links
Advertisement
 
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
remodel timeline and order of business brasilmom General DIY Discussions 6 02-19-2017 07:25 AM
Bathroom Remodel - General Questions MetalMan8008 Kitchen & Bath Remodeling 10 01-16-2017 03:50 PM
Remodel Can Housings For Plaster Ceilings BigJimmy Electrical 4 04-21-2014 06:26 AM
Remodel vs. repair bathroom slab on grade JCTeacher Plumbing 3 04-15-2012 05:54 AM




Top of Page | View New Posts