Hello again,

More bathroom work coming up tomorrow. I want to build a half divider wall to seperate the toilet from the door path. Its' only gonna be about 42" tall about 3 foot long. I'm planning on it being made of 2x4, covered with 5/8 drywall, and topped with a granite piece.

Here's my question for those with experience. If I nail or screw this to the floor and into a wall stud, will that be strong enough, or will it end up being wobbly? I have access to the underside, so I could run a 2x4 under there and add screw / nail into a joist for more stability.

What ya'll think?

Thanks,
Timothy
myowneq is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 01-25-2012, 02:23 PM   #2
Member
 
Join Date: Jan 2012
Location: Canada
Posts: 219
Rewards Points: 150
Default


Quote:
Originally Posted by myowneq View Post
Hello again,

More bathroom work coming up tomorrow. I want to build a half divider wall to seperate the toilet from the door path. Its' only gonna be about 42" tall about 3 foot long. I'm planning on it being made of 2x4, covered with 5/8 drywall, and topped with a granite piece.

Here's my question for those with experience. If I nail or screw this to the floor and into a wall stud, will that be strong enough, or will it end up being wobbly? I have access to the underside, so I could run a 2x4 under there and add screw / nail into a joist for more stability.

What ya'll think?

Thanks,
Timothy

I did this at my house to add a little privacy to a neo angle tub I put in. I opened the wall and added some blocking, and added some blocking under the floor. I used screws (which Iwish I had used some screw type lag). On the side that faces the tub, I installed tile that wrapped around the tub. The grout cracked right in the corner. So my best advice would be to lag it to the floor and wall and use some bracing in the wall itself. An alternative would be to install a column that goes straight up to the ceiling at the end of the wall which would limit the lateral movement.
psilva8 is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 01-25-2012, 02:52 PM   #3
Member
 
Join Date: Mar 2011
Location: Ohio
Posts: 1,646
Rewards Points: 1,000
Default


frame the wall 1-1/2 inches shorter the 3 feet and add a 2x4 at the end that goes through the floor as much as you have room for underneath. then add a block between the joists up against the 2x4 thats through the floor and fasten securely. the wall will be solid, more so after the sheetrock is installed. make sure to check the wall for plumb when you screw the drywall on as once its attatched you wont be able to push the wall plumb.
DannyT is offline   Reply With Quote
The Following User Says Thank You to DannyT For This Useful Post:
mae-ling (01-25-2012)
Sponsored Links
Advertisement
 
Old 01-25-2012, 03:05 PM   #4
Busy DIYer
 
picflight's Avatar
 
Join Date: Aug 2011
Location: S. California
Posts: 234
Rewards Points: 150
Default


Danny, what do you mean by 'block?'
picflight is offline   Reply With Quote
Old 01-25-2012, 03:12 PM   #5
Member
 
Join Date: Dec 2011
Location: Lafayette, LA
Posts: 106
Rewards Points: 87
Default


He means some form of wood placed parallel to the joists under the floor. It's then toenailed into the joists. Then the 2x4 coming through the floor is attached to that and provides additional structural integrity to the half wall.

I thought of the beam going to the ceiling idea, but I don't like it. I just didn't know if I was going overkill or if it was a good idea.

Thanks ya'll.
myowneq is offline   Reply With Quote
Old 01-26-2012, 09:34 AM   #6
Lic. Builder/GC/Remodeler
 
AtlanticWBConst.'s Avatar
 
Join Date: May 2006
Location: New England
Posts: 7,556
Rewards Points: 2,000
Default


Quick answer: We generally construct secure 1/2 walls by opening up the floor (subfloor) and installing a 4x4 fir post bolted to the nearest floor joist (or add 2x10's - across the joist bay and solidly bolt to them). The 4x4 becomes the end of the wall and the rest of the 2x4 wall framed is then framed-in, to it. Additional 2x10 blocking can be added around the 4x4, and then the floor (subfloor) closed back up.

I noted 2x10's, as these are generally the most common conventional floor framing joists.
__________________
- Build Well -
AtlanticWBConst. is offline   Reply With Quote
Old 01-26-2012, 07:50 PM   #7
Member
 
firehawkmph's Avatar
 
Join Date: Dec 2009
Location: Near Cleveland, Ohio
Posts: 2,312
Rewards Points: 2,452
Default


Tim,
another thing you can do along with what the others have said, if you have the space, is to build the wall out of 2 x 6's. Screw everything together, tie it into the floor joist below as suggested.
If you want to stick with the 2 x 4's, a piece of 1/2" plywood on both sides under the drywall, glued and screwed, will make it very stiff.
Mike Hawkins
firehawkmph is offline   Reply With Quote
Old 01-26-2012, 07:59 PM   #8
Member
 
Join Date: Dec 2011
Location: B.C. Canada
Posts: 2,694
Rewards Points: 2,262
Default


If you can't open up the floor or come from underneath.
A large wide metal L Bracket , had to make my own. did 2' on leg going up the stud, 14" on one going on top of bottom plate, made it 3.25" wide. I was able to screw through the bottom plate and into a floor joist, doubled up the end stud and used 3" screws in to it. You could even use stove bolts or 1/4" carriage head bolts
mae-ling is offline   Reply With Quote
Old 01-27-2012, 08:40 AM   #9
Lic. Builder/GC/Remodeler
 
AtlanticWBConst.'s Avatar
 
Join Date: May 2006
Location: New England
Posts: 7,556
Rewards Points: 2,000
Default


Quote:
Originally Posted by firehawkmph View Post
....another thing you can do along with what the others have said, if you have the a piece of 1/2" plywood on both sides under the drywall, glued and screwed, will make it very stiff.
Mike Hawkins
Yes, the install of plywood is a good point as well. We have had to do that to correct work by others and it definitely helps. You can even go thicker: 3/4" plywood on both sides, if space, floor-plan and design - allows it.
__________________
- Build Well -
AtlanticWBConst. is offline   Reply With Quote
Old 01-27-2012, 10:06 AM   #10
Member
 
Join Date: Dec 2011
Location: Lafayette, LA
Posts: 106
Rewards Points: 87
Default


The 2x6 half wall is going to take too much space. This wall will between a toilet and door with the door opening toward the toilet. I'm leaning toward the 2x4 planted through the floor as the best option. I still have to cover this with 5/8" drywall so I don't want it too thick.
myowneq is offline   Reply With Quote
Sponsored Links
Advertisement
 
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Looking for a step by step for framing basement walls/2x4's wrong direction/stairs??? xray328 Remodeling 27 06-19-2011 08:50 PM
Remove half walls & replace with wood railing/balusters jjgoss Remodeling 3 06-29-2010 08:05 PM
Need to rebuild outside steps and walls coming from basement doug123 Building & Construction 31 05-03-2010 07:45 AM
removing concrete parging from basement foundation walls. newzev Remodeling 1 07-24-2009 08:17 AM
Basement half walls to full walls Basement Man Remodeling 11 03-29-2009 02:33 PM




Top of Page | View New Posts