Advice regarding concrete floor


I have my 2nd floor bathroom down to the studs in my 87 year old home. Now facing a decision on whether or not to take a jack hammer to the two inches of concrete in the floor, or simply remove the existing tile, and retile. I have some of the tile removed now. This is the only chance I will want to take to bust up this floor, but will gladly avoid it if there is no good reason for it. Welcome any thoughts and/or advice.
dgfit is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 12-05-2013, 11:25 AM   #2
K&B Designer
 
Live_Oak's Avatar
 
Join Date: Aug 2013
Location: Memphis,. TN
Posts: 350
Rewards Points: 250
Default


Are you talking an old fashioned mudbed with tile on top, or are you talking actual concrete floors?
__________________
Do it right from the beginning if you only want to do the job once. It'll be cheaper in the long term.
Live_Oak is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 12-05-2013, 11:49 AM   #3
Member
 
Join Date: Jun 2013
Posts: 338
Rewards Points: 294
Default


It looks like concrete. You can see the area in this pic where I have broken up some of the tile. The open area is where the tub had been located


Advice regarding concrete floor-image-3792919170.jpg

Last edited by dgfit; 12-05-2013 at 02:22 PM.
dgfit is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 12-07-2013, 07:34 AM   #4
Member
 
Join Date: Jun 2013
Posts: 338
Rewards Points: 294
Default


Any thoughts?
dgfit is offline   Reply With Quote
Old 12-07-2013, 10:32 PM   #5
Member
 
Join Date: Jun 2013
Posts: 338
Rewards Points: 294
Default


.
dgfit is offline   Reply With Quote
Old 12-08-2013, 12:06 PM   #6
Not so new
 
12penny's Avatar
 
Join Date: Nov 2008
Location: Lehigh Valley, Pa.
Posts: 962
Rewards Points: 522
Default


Not sure why your thread hasn't been replied to.
Joe must be napping.

Hard to tell from here. Lots comes into play.
Is it cracked, sloped, flat etc.? My first thought
is to get rid the mortar bed, repair/update
any structure/plumbing/electric and install 3/4
advantech for subfloor.

But I'm not there.
12penny is online now   Reply With Quote
Old 12-08-2013, 09:43 PM   #7
Member
 
Join Date: Jun 2013
Posts: 338
Rewards Points: 294
Default


I don't have the tile up yet but it seems to be in ok shape. But I think I have decided to take it up - why do it part way. I am also in the process of replacing all water lines, complete rewire and upgrade service (all with permits).
dgfit is offline   Reply With Quote
Old 12-14-2013, 09:39 AM   #8
K&B Designer
 
Live_Oak's Avatar
 
Join Date: Aug 2013
Location: Memphis,. TN
Posts: 350
Rewards Points: 250
Default


It's always better to take things back to the studs/joists and start over.
__________________
Do it right from the beginning if you only want to do the job once. It'll be cheaper in the long term.
Live_Oak is offline   Reply With Quote
Old 12-14-2013, 12:31 PM   #9
Registered User
 
Join Date: Mar 2009
Posts: 11,730
Rewards Points: 526
Default


I agree... especially with older houses that tended to over-span the joists before building codes. Your joists may be fine for the loads or not; the water supply/drain line are run to the closest wall below (across the room pictured) telling me the span to the other joist-bearing wall may be greater; the total span may be 10-12'- if so- a 2x6 will span 8'11" if Doug-Fir #2 (20# load); http://publicecodes.cyberregs.com/ic...002_par017.htm

Which brings me to my point (finally)...you have a lot of weight on the joists (not counting bathroom fixtures- sink, toilet-) of materials;

1" reinforced regular weight concrete =12.5# per sq.ft.
1" plain lightweight concrete (1) = 8#
7/16" cementitious backerboard = 3#
Ceramic or quarry tile (3/4") on 1/2" mortar bed (1)= 16#
Ceramic or quarry tile (3/4") on 1" mortar bed (1) = 23#
1" mortar bed = 12#
1" slate (1) = 15#
3/8" marble tile = 6#
3/8" ceramic floor tile (1) = 4.7#

Pick yours and add them up- compare to span charts- remember to add P&L at 8#per sq.ft. attached below the joists.....

Gary
__________________
If any ads are present below my answer or words underlined/colored, I do not condone/support/use the product or services listed/linked to, they are there without my consent.
17,000 dryer fires a year, when did you last clean the inside of the dryer near motor or the exhaust ducting?
Gary in WA is offline   Reply With Quote
Sponsored Links
Advertisement
 
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Concrete Basics for the DIYer Mort Concrete, Stone & Masonry 7 11-22-2012 11:19 AM
Pro advice needed on concrete contract language toddmanqa Concrete, Stone & Masonry 0 03-22-2012 08:39 AM
Damp Concrete Garage Floor Tom S. Building & Construction 15 03-27-2010 08:23 AM




Top of Page | View New Posts