I'm t-ing off my 3/4 copper hot water line to run new hot water to several fixtures: two sinks, one dishwasher and two outdoor hot/cold spigots.
I figured I'd run a 3/4 PEX main, then branch off: but I'm curious: what's the maximum 1/2" PEX run I can have? I have one bathroom sink that's quite a distance away from the other fixtures.
Also, I'm curious how many 3/4-1/2-3/4 tees can you put on a main line? Would I be better off running a 3/4-3/4-3/4 tee to consolidate fixtures (by adding a 1/2-3/4-1/2 tee to serve two fixtures
?)
I figured I'd run a 3/4 PEX main, then branch off: but I'm curious: what's the maximum 1/2" PEX run I can have? I have one bathroom sink that's quite a distance away from the other fixtures.
Also, I'm curious how many 3/4-1/2-3/4 tees can you put on a main line? Would I be better off running a 3/4-3/4-3/4 tee to consolidate fixtures (by adding a 1/2-3/4-1/2 tee to serve two fixtures
?)