constructing new drain stack - need some pointers


Hi everyone,
I'm replacing old cast iron drain stack with sch 40 PVC.
I have attached a diagram of proposed setup (not to scale). Also Pic of basement setup before removal of CI pipe.

A few things I need to clarify:

1) for horizontal runs into main vertical stack I will use sanitary tees (LABELED A) NOT WYEs (plus a 1/8 bend).

2) If the above is correct will the horizontal 3" pipe attached to the 90 degree closet bend fit well into the san-tee, which has a slight upward tilt?

3) The 2" pipe from 2nd fl shower may be at a greater gradient than 1/4" per foot to accommodate for the toilet connection. Is this OK?

4) I will use a wye (LABELED B) NOT a san-tee for the 1st Fl bathroom run into the basement horizontal.

5) I will use a rodding tee for a cleanout next to sewer. Should I also put an angled wye with screw cap pointing down by sewer to make access if needed easier? The original CI cleanout is rusted shut.

6) does the 45 degree elbow (LABELED C) need to be wide sweep?

Thanks!
Attached Thumbnails
constructing new drain stack - need some pointers-20160424_185929.jpg   constructing new drain stack - need some pointers-20160419_160938.jpg  
Nick1 is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 04-24-2016, 11:49 PM   #2
Plumber
 
TheEplumber's Avatar
 
Join Date: Jul 2010
Location: North Idaho
Posts: 11,386
Rewards Points: 168
Default

Re: constructing new drain stack - need some pointers


Santees in the vertical are fine- no need for wyes in this case, but the 4x2 shower tee could be a wye set lower in the stack, with a vertical 45- then use a 90 on top of the 45 to make the 1/4" grade...

For the toilet- the PVC will have enough play when glued- so getting the grade won't be an issue- add support to any horizontal lines.

The clean out tee at the base is fine.

Not sure where "C" is- if it's the toilet, a 90 is what you want
__________________
When posting in forums, letting us know your location will help others give better feedback/advice/solutions to your questions
TheEplumber is online now   Reply With Quote
Sponsored Links
Advertisement
 
Old 04-25-2016, 10:20 PM   #3
Newbie
 
Join Date: Jun 2012
Posts: 11
Rewards Points: 26
Default

Re: constructing new drain stack - need some pointers


Thanks for the reply.
C was the 90 degree elbow in basement for 1st floor toilet. I will put a long sweep elbow there. Should I also put a clean out a the end of this horizontal?

A couple of questions about venting. ...
The 2nd floor shower/sink pipe has a vent before the vertical stack.
I didn't include in diagram as I just located it.

The kitchen sink was direct vented into main soil stack. I think this is against code.

Not sure about venting of 1st floor bathroom fixtures. I'll check them.

On the iron pipe setup there was a vent (iron pipe - the pvc pipe is from basement sink i removed) going in at the basement just above the floor. Pic attached. This vents to roof. I could reconfigure this to vent the kitchen sink and possibly the 1st floor bathroom fixtures.
Attached Thumbnails
constructing new drain stack - need some pointers-tmp_9306-20160419_1610131247676096.jpg  
Nick1 is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 04-25-2016, 10:57 PM   #4
Plumber
 
TheEplumber's Avatar
 
Join Date: Jul 2010
Location: North Idaho
Posts: 11,386
Rewards Points: 168
Default

Re: constructing new drain stack - need some pointers


Quote:
Originally Posted by Nick1 View Post
Thanks for the reply.
C was the 90 degree elbow in basement for 1st floor toilet. I will put a long sweep elbow there. Should I also put a clean out a the end of this horizontal?

No need for a clean out on the branch

A couple of questions about venting. ...
The 2nd floor shower/sink pipe has a vent before the vertical stack.
I didn't include in diagram as I just located it.

You need to vent the shower

The kitchen sink was direct vented into main soil stack. I think this is against code.

Depends- are there fixtures above it? I can't find it on your drawing.

Not sure about venting of 1st floor bathroom fixtures. I'll check them.

They need vents

On the iron pipe setup there was a vent (iron pipe - the pvc pipe is from basement sink i removed) going in at the basement just above the floor. Pic attached. This vents to roof. I could reconfigure this to vent the kitchen sink and possibly the 1st floor bathroom fixtures.
You can tie vents together, they need to be 6" above the rim of the fixtures served when connecting. They also need to be sized properly
__________________
When posting in forums, letting us know your location will help others give better feedback/advice/solutions to your questions
TheEplumber is online now   Reply With Quote
Sponsored Links
Advertisement
 
Reply

Tags
drain pvc


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Tie-in water softener drain into bathroom vent stack - meets code? klip Plumbing 14 01-11-2015 11:23 AM
Plugging / capping an old drain stack codykodes Plumbing 0 07-17-2014 07:44 PM
"custom" washer drain using rain downspout- venting question denemante Plumbing 5 02-13-2013 07:56 AM
Drain stack vent sizing JakAHearts Roofing/Siding 1 07-23-2010 04:44 PM
sewer backup and stench jayhill Plumbing 12 08-13-2008 11:06 PM




Top of Page | View New Posts