We are in the process of remodeling our basement and I've ran into a couple things that I think could be issues...

1. Drain where we want to put the shower is rusted and VERY slow to drain - I think it runs about 11' to the green lift station
2. Concerned the toilet is too close to concrete wall How far from the concrete wall should the toilet drain be?

Thoughts on both issues?








bad pic but the shower would be in the right hand corner and lift station is under the white structure
isuhunter is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 02-24-2016, 01:32 PM   #2
A "Handy Husband"
 
rjniles's Avatar
 
Join Date: Feb 2007
Location: South Carolina Low Country
Posts: 11,210
Rewards Points: 898
Default


Demo the concrete floor and install proper drains and vents. The toilet rough should be 12" from the finished wall (you can get away with 10" with the right toilet).
__________________
My electrical answers are based on 2017 NEC, you may have local amendments.

Location: Coastal South Carolina
rjniles is online now   Reply With Quote
Sponsored Links
Advertisement
 
Old 02-24-2016, 06:54 PM   #3
Member
 
Join Date: Oct 2011
Location: PA
Posts: 5,918
Rewards Points: 582
Default


really see no reason to breakout concrete ..standard commode rough in is 12" from finish wall....they do have 10" rough in though...as far as shower drain go's could remove cover and snake out line ..that would solve the slow drain issue...based on what you put on the shower floor you could replace drain and cover to match floor finish.....
ben's plumbing is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 02-25-2016, 05:24 PM   #4
Member
 
Join Date: Mar 2013
Location: Ohio
Posts: 5,703
Rewards Points: 1,952
Default


The lack of any venting method might be a small issue Ben.
Ghostmaker is offline   Reply With Quote
The Following User Says Thank You to Ghostmaker For This Useful Post:
ben's plumbing (02-29-2016)
Old 02-29-2016, 07:49 AM   #5
Member
 
Join Date: Apr 2014
Posts: 61
Rewards Points: 96
Default


Ok so I did some more work this weekend. I was able to get the cover off and can pull up rust flakes. I have a plumber called an waiting for him to snake it out. I'm trying to figure out how I will run all the plumbing in this area. I'll need hot and cold water to 4 different locations in these two rooms and drains at all of those. From what I can tell I'll need to go back to the cast iron into the floor under the sink for 3 of them.

-I would use a 2" drain line through the studs for all of these right?
- I plan to use Pex for all the water lines. Would you run them over hte top and down or around and through the walls/studs?



This is our shower drain


The toilet flange was metal and is completely disintegrated. How will I attach a flange for the toilet? I forgot to take a picture after I took the wax ring off.

isuhunter is offline   Reply With Quote
Old 02-29-2016, 08:21 AM   #6
Member
 
WhatRnsdownhill's Avatar
 
Join Date: Jan 2016
Location: Long Island, NY
Posts: 1,104
Rewards Points: 2,220
Default


Quote:
Originally Posted by isuhunter View Post
Ok so I did some more work this weekend. I was able to get the cover off and can pull up rust flakes. I have a plumber called an waiting for him to snake it out. I'm trying to figure out how I will run all the plumbing in this area. I'll need hot and cold water to 4 different locations in these two rooms and drains at all of those. From what I can tell I'll need to go back to the cast iron into the floor under the sink for 3 of them.

-I would use a 2" drain line through the studs for all of these right?
- I plan to use Pex for all the water lines. Would you run them over hte top and down or around and through the walls/studs?



This is our shower drain


The toilet flange was metal and is completely disintegrated. How will I attach a flange for the toilet? I forgot to take a picture after I took the wax ring off.

First the sewer ejector is not plumbed correct, it should be a Y not a TY for the discharge into the stack, you need to add vents to the fixtures, how are you going to connect a shower to that drain? there are some repair flanges you can use for re connecting the toilet..just do a search on Amazon for them..
WhatRnsdownhill is offline   Reply With Quote
Old 02-29-2016, 08:43 AM   #7
Member
 
Join Date: Apr 2014
Posts: 61
Rewards Points: 96
Default


Quote:
Originally Posted by WhatRnsdownhill View Post
First the sewer ejector is not plumbed correct, it should be a Y not a TY for the discharge into the stack, you need to add vents to the fixtures, how are you going to connect a shower to that drain? there are some repair flanges you can use for re connecting the toilet..just do a search on Amazon for them..

Good to know on the Y. I'll look at getting that changed out.

Is there a good source for "proper venting". Can i run them up and combine them all and then tie into the main vent? (Maybe that's not correct)

We haven't decided on what we were going to do for a shower yet. Probably a fiberglass base. Suggestions?

I'll search for those, thanks for your input!
isuhunter is offline   Reply With Quote
Old 02-29-2016, 09:50 AM   #8
Member
 
WhatRnsdownhill's Avatar
 
Join Date: Jan 2016
Location: Long Island, NY
Posts: 1,104
Rewards Points: 2,220
Default


Quote:
Originally Posted by isuhunter View Post
Good to know on the Y. I'll look at getting that changed out.

Is there a good source for "proper venting". Can i run them up and combine them all and then tie into the main vent? (Maybe that's not correct)

We haven't decided on what we were going to do for a shower yet. Probably a fiberglass base. Suggestions?

I'll search for those, thanks for your input!
you can use AAV on each fixture for a vent, since we cant see whats under the concrete, its hard so say how they ran the drain lines and if you vented the sink if you would then be wet venting the toilet, but any vents are better than none..as far as the shower base, you will have to chop the concrete by the drain to make sure there is a trap and to stub up with a new clean pipe for the gasket to go around when you install the new shower base..the 3 inch pipe coming out of the sewer ejector should be a vent and you can tap into that if you wanted to run hard pipe vents to the fixtures..

Last edited by WhatRnsdownhill; 02-29-2016 at 09:52 AM.
WhatRnsdownhill is offline   Reply With Quote
Old 02-29-2016, 04:52 PM   #9
Member
 
Join Date: Oct 2011
Location: PA
Posts: 5,918
Rewards Points: 582
Default


Quote:
Originally Posted by Ghostmaker View Post
The lack of any venting method might be a small issue Ben.
I was assuming the commode and sink was already properly vented....he was leaving it as is ..same with shower drain...just unclog it...but good point if not vented properly..
ben's plumbing is offline   Reply With Quote
Old 03-01-2016, 06:54 PM   #10
Member
 
Join Date: Apr 2014
Posts: 61
Rewards Points: 96
Default


Ok so plumber came over today and opened up the clogged drain. He said he can tell there is plenty of build up and is suggesting to rip it up and replace with pvc.

Which leads me to my next question...

Should I tear up the concrete and put drain lines in for the 1 bathroom sink, toilet, laundry room sink, shower and washer dryer? The only option I currently have for the sinks and laundry is to run a pipe in the wall and come back to cast coming up out of the concrete where I plan to place a wall.

If so can I tie back into the ejector or how do I get it into there?
isuhunter is offline   Reply With Quote
Old 03-01-2016, 07:21 PM   #11
Member
 
Join Date: Apr 2014
Posts: 61
Rewards Points: 96
Default


Green - Ejector Pump
Red - existing drains
Blue - should I tear up concrete and replace/add these drains or plumb to the indicated drains (blue circles)

isuhunter is offline   Reply With Quote
Old 03-01-2016, 09:18 PM   #12
Member
 
WhatRnsdownhill's Avatar
 
Join Date: Jan 2016
Location: Long Island, NY
Posts: 1,104
Rewards Points: 2,220
Default


Quote:
Originally Posted by isuhunter View Post
Ok so plumber came over today and opened up the clogged drain. He said he can tell there is plenty of build up and is suggesting to rip it up and replace with pvc.

Which leads me to my next question...

Should I tear up the concrete and put drain lines in for the 1 bathroom sink, toilet, laundry room sink, shower and washer dryer? The only option I currently have for the sinks and laundry is to run a pipe in the wall and come back to cast coming up out of the concrete where I plan to place a wall.

If so can I tie back into the ejector or how do I get it into there?
NO, the only chopping would be to install a new shower line and vent, you can chop back to the larger toilet pipe and put a y on that line, the above ground fixtures you pipe in the walls, unless you want to chop the whole floor up..
WhatRnsdownhill is offline   Reply With Quote
Sponsored Links
Advertisement
 
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Finishing my basement myself and have some questions boat21 Remodeling 2 09-20-2012 02:13 PM
Insulating basement - questions jtmann HVAC 7 11-19-2010 03:20 AM
Finishing basement, had a few questions about ductwork... Wyjeep Plumbing 12 04-27-2010 09:27 PM
Questions about insulation in basement remodel BillG Remodeling 1 04-27-2010 08:15 AM
Basement Remodel - DWV questions. kpfeif Plumbing 3 03-02-2010 07:59 PM




Top of Page | View New Posts