That roof system is actually trusses and removing any portion of the truss will cause major structural problems for your roof support. If you plan on making changes to that you will have to get a structural engineer involved in order to do it safely and effectively.
Those "Trusses" are actually manufactured on site, at the time the garage was built. You can tell by looking at them.

A real lumber yard will have someone there, that can spec out the proper beam and same for what they wish to do with raising the ceiling.



gregzoll is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 06-30-2014, 01:17 AM   #17
liscenced electrician
 
Join Date: Jul 2008
Location: Oregon coast
Posts: 1,013
Rewards Points: 540
Default


Quote:
Originally Posted by gregzoll View Post
Those "Trusses" are actually manufactured on site, at the time the garage was built. You can tell by looking at them.

A real lumber yard will have someone there, that can spec out the proper beam and same for what they wish to do with raising the ceiling.


I figured out that I don't actually need to raise the ceiling. I was having a brain fart moment because everything is at different heights. As far as I can tell, the house was built first and then the laundry room and then the garage. The garage ceiling is off level and one side needs to go down by a few inches. The laundry room side is too low and needs to be raised about an inch.

Is there a consensus on whether I can adjust the "trusses" myself and use new lumber or I'm not allowed to touch them? If it needs to be engineered, 'll just cut the nails, adjust the height and re-nail it, so the inspector won't know I touched them.
jimmy21 is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 06-30-2014, 01:20 AM   #18
liscenced electrician
 
Join Date: Jul 2008
Location: Oregon coast
Posts: 1,013
Rewards Points: 540
Default


Here are some pics from today






And here's the apprentice
jimmy21 is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 06-30-2014, 12:18 PM   #19
Electrical Contractor
 
jbfan's Avatar
 
Join Date: Jun 2004
Location: Newnan GA
Posts: 8,380
Rewards Points: 6,370
Default


Steel toed boots?
__________________
Yes I am a pirate, two hundred years too late
The cannons don't thunder, there's nothing to plunder
I'm an over-forty victim of fate.
jbfan is online now   Reply With Quote
Old 06-30-2014, 12:27 PM   #20
Member
 
Join Date: Dec 2006
Posts: 17,158
Rewards Points: 6,652
Default


If you need to raise the lower timber. Do like I stated before. You will have to remove that 1x6 or 1x8. Then nail a new 2x4 or 2x6, that will go the full length of that area at the height you need it. Then just cut off the 2x4 that sticks down lower where the old 2x4 was.

The 1x6 or 1x8 is being used to stop any movement laterally. Just replace that piece with a new 1x8 after doing the above.

You do not want to remove the old bottom 2x4, until you get the new one it place and attached at the studs. You may be required to use Wind straps for your area.



gregzoll is offline   Reply With Quote
Old 07-08-2014, 08:12 PM   #21
liscenced electrician
 
Join Date: Jul 2008
Location: Oregon coast
Posts: 1,013
Rewards Points: 540
Default


Now I'm working towards taking down a bearing wall down the center and putting in a beam. It looked like there was a footing under the wall but there is not. The little concrete stem wall is poured on top of the slab. So now I'm planning to jack the concrete up and pour a footing under where I need it, but I'm not sure how big I need it. Do I need to have a stem wall coming up or is that only for exterior applications?
Attached Thumbnails
converting garage in to habitable space-layout2-copy.jpg  

Last edited by jimmy21; 07-08-2014 at 08:15 PM.
jimmy21 is offline   Reply With Quote
Old 07-09-2014, 05:20 PM   #22
liscenced electrician
 
Join Date: Jul 2008
Location: Oregon coast
Posts: 1,013
Rewards Points: 540
Default


Anyone offer any help? Can the footing be flush with the rest of the slab?
jimmy21 is offline   Reply With Quote
Old 07-09-2014, 05:42 PM   #23
Member
 
Join Date: Dec 2006
Posts: 17,158
Rewards Points: 6,652
Default


Quote:
Originally Posted by jimmy21 View Post
Anyone offer any help? Can the footing be flush with the rest of the slab?
You should be asking those questions to your local building department.



gregzoll is offline   Reply With Quote
Sponsored Links
Advertisement
 
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Install (attic) door to access space above garage ? westbank Building & Construction 7 10-03-2013 01:05 PM
Garage space to mudroom Snackattacker Building & Construction 7 04-21-2013 04:21 PM
In theory: expand attached garage, or add detached garage? hyunelan2 Building & Construction 5 11-09-2012 06:34 PM
Converting Garage to Bedroom cibula11 Remodeling 6 07-14-2009 04:07 PM
Are You Wasting Space In Your Garage? BJLower Carpentry 2 10-07-2008 08:54 PM




Top of Page | View New Posts