hot tub base - pour concrete into a retaining structure?


Hey all - I plan to put my hot tub on the ground, but there is a 12 inch drop across that area. See the attached image for my solution. Basically, I'd build a "box" with 6x6 planks, two levels high. I'd dig down 12 inches on one side - the other side would sit on the ground.

After a bunch of research, many have been successful setting their tubs right onto crushed stone/crusher run. That was my plan - I'd build my retaining box then fill with crusher-run to the top, compact (gas powered) and level it, then sit the tub on the top.

However, it voids the warranty if it's not on concrete.

OK..so then, I'd fill in half with crusher run, the top it off with poured concrete?

I plan to drive rebar into the ground on all sides. Large steel L brackets on all corners (through bolted). It may be overkill, but I also planned to take a steel rod and span from low-to-high-side and bolt it on the outside.

Full, this tub will be like 5000 pounds.

I'm suddenly concerned my retaining structure (especially on the low side) may not support the weight. I'm not sure how much weight is pushing down, and/or if that weight is also pushing sideways (wanting to explode out my 6x6 beams). I suppose the weight of concrete and crusher run is similar...but concrete is solid, so presumably would exert less outward pressure.

Thoughts here?
Attached Thumbnails
hot tub base - pour concrete into a retaining structure?-hot-tub-base.jpg  
denemante is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 01-11-2018, 04:47 PM   #2
retired framer
 
Join Date: Jun 2017
Location: Fraser Valley BC Canada
Posts: 26,385
Rewards Points: 20,660
Default

Re: hot tub base - pour concrete into a retaining structure?


If you are pouring concrete there is no need for the 6x6 unless you like getting slivers in the feet.
Would you be looking for a step on the 12" end?
Nealtw is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 01-11-2018, 04:52 PM   #3
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 36,386
Rewards Points: 17,912
Default

Re: hot tub base - pour concrete into a retaining structure?


No way would I do it that way!
No location in your profile so hard to say what the correct way to do it is.
If I had to do it no matter where you are I'd be poring proper footings for that location and using, concrete block not pressure treated lumber.
__________________
When posting in forums, letting us know your location will help others give better feedback/advice/solutions to your questions
joecaption is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 01-11-2018, 04:56 PM   #4
Member
 
Join Date: Apr 2010
Posts: 391
Rewards Points: 340
Default

Re: hot tub base - pour concrete into a retaining structure?


Should have mentioned - I'm in Atlanta. The earth is red clay.

In my image - the face that your looking at will actually be a deck that meets the hot tub about halfway up.

So the hot tub isn't down inside the 6x6 structure, I need to fill this box to the top. Based on the grade, the "top" would be level with the earth on the high side.

Finally - I wanted to add an addendum - on the far back/lowest corner, I'm considering digging 3 feet down, putting a 12-inch concrete form in it with rebar sticking out about 12 inches. The 6x6 corner would sit on top, and I'd drill holes in the 6x6s and push them down over the rebar. But maybe this is overkill...
denemante is offline   Reply With Quote
Old 01-11-2018, 05:00 PM   #5
retired framer
 
Join Date: Jun 2017
Location: Fraser Valley BC Canada
Posts: 26,385
Rewards Points: 20,660
Default

Re: hot tub base - pour concrete into a retaining structure?


Quote:
Originally Posted by denemante View Post
Should have mentioned - I'm in Atlanta. The earth is red clay.

In my image - the face that your looking at will actually be a deck that meets the hot tub about halfway up.

So the hot tub isn't down inside the 6x6 structure, I need to fill this box to the top. Based on the grade, the "top" would be level with the earth on the high side.

Finally - I wanted to add an addendum - on the far back/lowest corner, I'm considering digging 3 feet down, putting a 12-inch concrete form in it with rebar sticking out about 12 inches. The 6x6 corner would sit on top, and I'd drill holes in the 6x6s and push them down over the rebar. But maybe this is overkill...
So you have already jumped into the deep end. No advice needed.
Nealtw is offline   Reply With Quote
Old 01-11-2018, 10:18 PM   #6
Member
 
Msradell's Avatar
 
Join Date: Sep 2011
Location: Louisville Kentucky
Posts: 2,765
Rewards Points: 824
Default

Re: hot tub base - pour concrete into a retaining structure?


Whatever you do don't leave any of the rebar exposed, it all should be covered with concrete. If any of it is not covered by concrete it will rust and the rust will work its way into the concrete in the expansion caused by the rust will split the concrete.
__________________
Written using Dragon Naturally Speaking
Msradell is offline   Reply With Quote
Old 01-12-2018, 05:37 AM   #7
Master General ReEngineer
 
Bondo's Avatar
 
Join Date: Dec 2007
Location: Chaumont River, Ny.
Posts: 8,633
Rewards Points: 1,344
Default

Re: hot tub base - pour concrete into a retaining structure?


Quote:
OK..so then, I'd fill in half with crusher run, the top it off with poured concrete?

I plan to drive rebar into the ground on all sides. Large steel L brackets on all corners (through bolted). It may be overkill, but I also planned to take a steel rod and span from low-to-high-side and bolt it on the outside.

Full, this tub will be like 5000 pounds.

I'm suddenly concerned my retaining structure (especially on the low side) may not support the weight. I'm not sure how much weight is pushing down, and/or if that weight is also pushing sideways (wanting to explode out my 6x6 beams).
Ayuh,.... Once ya get the stone compacted, there's virtually no outward forces, just downward,....
A 4" cap of concrete is more than enough,...
Bondo is offline   Reply With Quote
Old 01-12-2018, 10:26 AM   #8
Member
 
Join Date: May 2006
Location: Cleveland, Ohio
Posts: 358
Rewards Points: 54
Default

Re: hot tub base - pour concrete into a retaining structure?


If using a pad - I think you need to bond the tub to the rebar.
tribe_fan is offline   Reply With Quote
Old 01-12-2018, 12:41 PM   #9
Member
 
Join Date: Feb 2014
Posts: 4,640
Rewards Points: 4,434
Default

Re: hot tub base - pour concrete into a retaining structure?


Overthinking, maybe.

If your hot tub is 6' x 6' = 36' SF.

5000 lbs. divided by 36' SF = 139 lbs per SF.
ron45 is offline   Reply With Quote
Old 01-12-2018, 10:03 PM   #10
Member
 
Msradell's Avatar
 
Join Date: Sep 2011
Location: Louisville Kentucky
Posts: 2,765
Rewards Points: 824
Default

Re: hot tub base - pour concrete into a retaining structure?


Quote:
Originally Posted by ron45 View Post
Overthinking, maybe.

If your hot tub is 6' x 6' = 36' SF.

5000 lbs. divided by 36' SF = 139 lbs per SF.
I think your 5000 pound estimate is way too high and the size you estimated is way too small. A few years ago we had one that was about 8'x8" and it held about 280 gallons. So even if you go on the high side and say 300 gallons that's only about 2500 pounds. Using those numbers you come out with about 51 psf. Which is less pressure than you plan something when you are standing on it.
Gregsoldtruck79 likes this.
__________________
Written using Dragon Naturally Speaking
Msradell is offline   Reply With Quote
Old 01-13-2018, 06:39 AM   #11
Member
 
Join Date: Dec 2017
Posts: 3,963
Rewards Points: 1,954
Default

Re: hot tub base - pour concrete into a retaining structure?


Agreed Msradell,

We have had 3 - 8' x 8' spas at our different homes and I just built CCA decks under them. Kept the decks wood properly sealed and loved them all.
__________________
...

Last edited by Gregsoldtruck79; 01-13-2018 at 04:11 PM.
Gregsoldtruck79 is online now   Reply With Quote
Sponsored Links
Advertisement
 
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Concrete base for shed - what do I need to know to do it right? r0ckstarr Concrete, Stone & Masonry 23 05-15-2016 09:35 AM
To pour concrete ove asphalt or not to pour concrete over asphalt. murph2255 Concrete, Stone & Masonry 15 03-10-2013 07:25 AM
Retaining wall combining concrete blocks and PT lumber JEL Landscaping & Lawn Care 1 04-06-2012 08:39 PM
OK to to mix and pour one bag at a time for a concrete step? czissman Concrete, Stone & Masonry 6 03-08-2012 07:00 PM
Driveway - pour concrete over granite curb? homeowner54 Building & Construction 4 06-09-2010 10:10 PM




Top of Page | View New Posts