Ash pit and finishing a basement question


Not sure if this question belongs in this forum, so mods feel free to move it if needed.

I am looking at finishing a part of out unfinished part of our basement

One of the two exterior block walls has an ash pit cleanout from a fireplace above. It's just a metal roughly 12x12" door which swings out.

I am planning on putting 2" XPS foam with a 2x4" framing in front of that. How do I go about the ash cleanout? I obviously don't want to seal that opening.

Thanks
BimmerRacer is offline  
Sponsored Links
Advertisement
 
Old 10-14-2016, 04:24 PM  
JUSTA MEMBER
 
Join Date: Feb 2014
Location: Central Wyoming
Posts: 11,901
Rewards Points: 3,566
Default

Re: Ash pit and finishing a basement question


Frame around the clean out, then install a door with a magnetic catch , that will open when pushed in the right place.

This makes a hidden access point , that is like a secret "stash" area .


ED
de-nagorg is offline  
Sponsored Links
Advertisement
 
Old 10-14-2016, 05:19 PM  
Member
 
Join Date: Feb 2009
Posts: 153
Rewards Points: 113
Default

Re: Ash pit and finishing a basement question


So nothing special in terms of fire proofing etc?
BimmerRacer is offline  
Sponsored Links
Advertisement
 
Old 10-14-2016, 05:33 PM  
Member
 
Join Date: Oct 2016
Posts: 62
Rewards Points: 128
Default

Re: Ash pit and finishing a basement question


I would seal between the masonry and wall with some sheet metal and double up drywall wouldn't be a terrible idea.
DIYknot is offline  
Old 10-14-2016, 05:44 PM  
Member
 
Join Date: Feb 2009
Posts: 153
Rewards Points: 113
Default

Re: Ash pit and finishing a basement question


Quote:
Originally Posted by DIYknot View Post
I would seal between the masonry and wall with some sheet metal and double up drywall wouldn't be a terrible idea.
sketch of what you mean please?
BimmerRacer is offline  
Old 10-14-2016, 06:30 PM  
Member
 
Join Date: Oct 2016
Posts: 62
Rewards Points: 128
Default

Re: Ash pit and finishing a basement question


I am not too computer savvy.

I would close the gap between the framing and the chute with come mild sheet metal (kind of an L-bend).

I would seal that sheet metal to the concrete with the fireproof caulk stuff and then cover the framing with the drywall.
DIYknot is offline  
Old 10-14-2016, 07:13 PM  
Member
 
Join Date: Feb 2009
Posts: 153
Rewards Points: 113
Default


I see. Another interesting observation is that the area behind the door seems to just be a hole in the dirt?? I stuck a 3' long or so stick in there and it just goes, not hitting any sort of structure behind. Also pulled a something that looked like it was growing leaves?! That chimney goes along the outside wall so how are those things actually constucted? Confused!
BimmerRacer is offline  
Old 10-20-2016, 07:42 AM  
Member
 
Join Date: Oct 2010
Posts: 4,982
Rewards Points: 2,448
Default

Re: Ash pit and finishing a basement question


Assuming it is not decommissioned chimney, I would follow general fire blocking rules. What is the rule about wood burning stove? Sorry I don't have the info but it seems you can start there. I would keep the wood studs at least 2" off the opening all around and put 2 layers of concrete board there. Cut out the opening and line the gap with 2 layers of the same board to the opening. Parge with masonary cement. All walls to the ceiling must have fire blocking. I would insulate at least that area with rockwool. You might use steel studs around the area.
If you use sheetmetal, the sheet needs to be fairly thick and double walled with joints sealed. For access, look for metal door. Electricals may have some you can use.
Chimney is built on a concrete foundation. You shouldn't be hitting dirt. It may be built up ash but you should be hitting concrete/block. Any leaf or even a bone or two may have fallen through the chimney.

Last edited by carpdad; 10-20-2016 at 07:45 AM.
carpdad is online now  
Old 10-20-2016, 01:56 PM  
Member
 
Join Date: Feb 2009
Posts: 153
Rewards Points: 113
Default

Re: Ash pit and finishing a basement question


It looks and feels like wet dirt. I'll snap a pic or two and post. And see if I can find a longer stick to pock around in there.
BimmerRacer is offline  
Sponsored Links
Advertisement
 
 

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off





Top of Page | View New Posts