We need to do a bit of brick patch/re-laying of the brick parapet on our detached 10x20 1950s garage. It is 3 walls of CMU with 5 courses of brick on top. The lowest point of the roof, the parapet is probably say 8-inchs and on the highest point of the roof, the parapet is probably 3-inches.
My question is how long do we have to wait for the mortar to set before we can flash over the brick parapet with the Liberty peel-n-stick roofing we have planned. We'll need to coat the brick parapet sides with asphalt primer.
Thanks so much!
My question is how long do we have to wait for the mortar to set before we can flash over the brick parapet with the Liberty peel-n-stick roofing we have planned. We'll need to coat the brick parapet sides with asphalt primer.