Electrical
Hi all,
I'm adding a 100amp subpanel in my attached garage. To avoid going the long way through the second-story attic, I'm planning to run the line across the front yard, buried 18" in Sch40. The resulting conduit path starting from the main panel is:
down 5'
sweep 90* to horizontal
run 9'...