Shed Roof Questions


I have a couple of questions regarding a shed roof I am in the middle of repairing. I'm repairing it because whoever installed it originally didn't do a good job with the shingles/tar paper and this led to 3 sections of the roof rotting through and leaking. I have taken off the shingles and tar paper, removed all the roofing nails I could, and replaced the damaged plywood. After I did that, I checked the weather report and trusted what they said and finished out the day by watching some college football without putting tar paper on the roof. Well it rained the next day and the roof got pretty wet. I put a tarp over it when I woke up and realized it was raining but the plywood did get pretty wet. My questions are:
  1. Do I need to let the plywood dry out before I put the tar paper and shingles on?
  2. How do the combination of drip edge and tar paper get put on? I assume I install the drip edge all the way around and then put the tar paper on and seal it to the top of the drip edge with roofing asphalt? Should I overhang the drip edge with the tar paper at all?
  3. Please recommend an overhang for the shingles. How far do you recommend overhanging the shingles over the drip edge? On bottom edge/side edge? Not looking for anything fancy, just standard overhang recommendation.
Thanks for your help.

jobondur is offline   Reply With Quote
Old 10-04-2010, 11:52 AM   #2
Residential Roofer
 
Slyfox's Avatar
 
Join Date: Jun 2008
Location: Struthers, Ohio
Posts: 803
Rewards Points: 500
Default

Shed Roof Questions


Letting it dry out would be good, but shingle roofs do allow air filtration 'breathable' thus it would dry out after wards as well.

Install the drip edge on the eaves.
Install your felt paper, run it a little up from the edge of the eave drip,
maybe a quarter too half inch or so.
Install your gable end drip edge.
Overhang of shingles on average is one half inch, for both the eave and rakes.
As far as using roof cement on the nailer portion of the drip edge,
I have only seen that done in Florida locations, so you might want to ask someone local, like an employee at the store or lumber yard where you purchased the materials.

__________________
God Family Country Work Play
Facebook <> Twitter
Slyfox Exteriors Co.
Slyfox is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Newbie roofing a shed with a gambrel roof tomseeley Roofing/Siding 2 09-08-2010 01:11 PM
Questions about flat roof repair-repalcement crhilton Roofing/Siding 5 08-21-2010 02:25 AM
Roof Transition Questions smokinleroy Roofing/Siding 8 11-29-2009 08:58 AM
Flat roof related questions christy123 Roofing/Siding 8 12-10-2008 12:30 AM
Flat roof - Rolled? - leaks Advice? JJ2001 Roofing/Siding 4 11-19-2006 07:17 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.