Hi, In Mass, 15 yr old raised ranch, shingles have been blowing off during the last 2 wind storms, no felt under shingles, can see the plywood., other areas are curling at the edge.


let me know your thoughts on the following contract items for a full roof replacement

roof size 16
architectual OC trudefinition Duration series with surenail
tarp roof to ground
remove 1 layer of shingles
replace bad sheathing 1 free
15 lb felt
starter course at all roof edges
metal edging on gable ends
replace all pipe collars heavy duty alluminium 1 pipe 4"
ice and water shield 6'up from edge, 18" on gables
premium ridge vent 46 ft
clean up magnet including return if snow on ground
matching hip and ridge shingles on peak


your thoughts would be greatly appreciate
anything i am missing.

have until Monday to cancel

thank you
Greg


Last edited by stack316; 02-22-2013 at 10:20 AM. Reason: more info
stack316 is offline   Reply With Quote
Old 02-10-2013, 01:51 PM   #2
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 26,428
Rewards Points: 198
Default

Roof replacement contract


Have then install drip cap on all outside edges not just the gable ends.
That's were it's most likly to rot.
If your having that much trouble with them blowing off then I would have it in writing that there to be installed according to the manufactures directions for a high wind area. Most would call for 6 nails not just 4 and an extra nail on the high side on the rakes.

joecaption is offline   Reply With Quote
Old 02-10-2013, 03:47 PM   #3
747
registered
 
747's Avatar
 
Join Date: Feb 2005
Location: Illinois (kankakee county)
Posts: 1,332
Rewards Points: 4
Default

Roof replacement contract


Quote:
Originally Posted by joecaption View Post
Have then install drip cap on all outside edges not just the gable ends.
I noticed this was missing to from contract. I like at least 6 nails also per shingle do to your wind problem. Everything else looks ok. He also should have put in contract exact price to replace any sheathing. Example 50 dollars installed 1/2 inch cdx.

Ps. I'm going to guess around 8,000-9,000 for this job. Not that its any of my business.

Last edited by 747; 02-10-2013 at 03:52 PM.
747 is offline   Reply With Quote
Old 02-10-2013, 06:30 PM   #4
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 26,428
Rewards Points: 198
Default

Roof replacement contract


Better check your local building dept. to see if you need a permit and inspections. MA can be a real pain for things like this.
joecaption is offline   Reply With Quote
Old 02-10-2013, 06:46 PM   #5
Newbie
 
Join Date: Feb 2013
Posts: 11
Rewards Points: 0
Default

Roof replacement contract


Thank you for responses. Left some stuff out.....

No specifics on nail count, but does have 'all roofing materials guaranteed as specified by manufacturer'

There is a spot that reads they will obtain any and all permits

96 additional for sheathing


Hoping for some unusual sunny warmer days as the install will be the week of Feb. Should be 1 day

6,500
stack316 is offline   Reply With Quote
Old 02-10-2013, 07:02 PM   #6
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 26,428
Rewards Points: 198
Default

Roof replacement contract


Unless it's in writing it does not count.
The manufactuer will only require 4 nails it's up to your to have them change it before work begins.
Might take them a whole 15 min extra time and couple coils of nails extra so do not let them bend you over on this.
joecaption is offline   Reply With Quote
Old 02-10-2013, 08:05 PM   #7
Roofmaster
 
Join Date: Oct 2012
Location: Maryland
Posts: 3,621
Rewards Points: 22
Default

Roof replacement contract


You need the following:

A statement about the contractor keeping the house in a water-tight condition during construction, and that he is responsible for any damage that ensues as a result of not doing so.

A statement that the roof will be installed in accordance with the manufacturers latest installation instructions for the highest wind rating achievable with the selected shingle, and in accordance with the manufacturers requirements for warranty.

Ice dams must be installed at valleys also, if applicable.

Feft should be ASTM D226 type 1

Nails must be of domestic manufacture.

What about fascia cladding, drip edge, gutters and downspouts?

Replacement sheathing should be at unit price per square foot with minimum replacement size of 4 x 4 ft. and spanning a minimum of three supports.
__________________
" A lot of men build things, and a lot of things fall down "


Last edited by jagans; 02-10-2013 at 08:08 PM.
jagans is offline   Reply With Quote
Old 02-10-2013, 08:20 PM   #8
Not A Licensed Pro
 
Join Date: May 2008
Location: Atlanta, GA (Cobb)
Posts: 22
Rewards Points: 0
Default

Roof replacement contract


Too lazy to go down and check an opened GAF timberline single pack to see if instructions are in there with wind nailing. But here's tamko's

Roof Warranty offered? Or is this a fly by night gone tomorrow operation? Are the roofers going to do anything to screw you out of the manufacturer's full start warranty?

In the house I bought (which passed roof inspection by a roof inspector I specifically got - he so failed me) had ALL the shingles nailed wrong.... it was like the 'roofer' was intentionally nailing every shingle above the nail line so my shingles are attached with 4 nails above centerline, and not 8 (the nails on centerline on the shingle row above SHOULD have pierced the top of the row of the shingles below).... so now I have "shingle avalanches" where groups of shingles had slid down.... SINCE the shingles were ALL attached wrong the full start warranty was VOID. Pity.... roof was 4 years old when I bought it, now 7 years old and I'll be reroofing this year. I've patched it up with new shingles for now in the trouble areas, and been renailing and cementing for the time being...

Thought I would piggyback off this post... isn't 15lb felt just sooo bare minimum? What do you roofers thing of grace triflex w/plastic cap nails... over felt?
Attached Thumbnails
Roof replacement contract-tamkonailing.jpg  
kevinb70 is offline   Reply With Quote
Old 02-10-2013, 08:26 PM   #9
747
registered
 
747's Avatar
 
Join Date: Feb 2005
Location: Illinois (kankakee county)
Posts: 1,332
Rewards Points: 4
Default

Roof replacement contract


Quote:
Originally Posted by stack316 View Post
Thank you for responses. Left some stuff out.....

No specifics on nail count, but does have 'all roofing materials guaranteed as specified by manufacturer'

There is a spot that reads they will obtain any and all permits

96 additional for sheathing


Hoping for some unusual sunny warmer days as the install will be the week of Feb. Should be 1 day

6,500
Great price.

Last edited by 747; 02-10-2013 at 08:29 PM.
747 is offline   Reply With Quote
Old 02-10-2013, 09:03 PM   #10
Newbie
 
Join Date: Feb 2013
Posts: 11
Rewards Points: 0
Default

Roof replacement contract


The co is a preferred. OC Contractor with a 10 year limited warranty.
What do you expect the cost increase will be if requested to use 30 felt.
And.
Cost to use 6 nails which is required for the 135 mph wind protection and 4 nails is min installation per OC website

Thank you
stack316 is offline   Reply With Quote
Old 02-10-2013, 09:39 PM   #11
747
registered
 
747's Avatar
 
Join Date: Feb 2005
Location: Illinois (kankakee county)
Posts: 1,332
Rewards Points: 4
Default

Roof replacement contract


Quote:
Originally Posted by stack316 View Post
The co is a preferred. OC Contractor with a 10 year limited warranty.
What do you expect the cost increase will be if requested to use 30 felt.
And.
Cost to use 6 nails which is required for the 135 mph wind protection and 4 nails is min installation per OC website

Thank you
Minimal. I was going to mention 30 pound instead of 15 also.
747 is offline   Reply With Quote
Old 02-13-2013, 12:39 PM   #12
Newbie
 
Join Date: Feb 2013
Posts: 11
Rewards Points: 0
Default

Roof replacement contract


Decided to change the contract and upgrade to Owens Corning Deck Defense High Performance Roof Underlayment
$200 increase.

Last edited by stack316; 02-13-2013 at 07:22 PM.
stack316 is offline   Reply With Quote
Old 02-13-2013, 07:06 PM   #13
Member
 
ParagonEx's Avatar
 
Join Date: Sep 2011
Location: Milwaukee, WI
Posts: 249
Rewards Points: 0
Default

Roof replacement contract


The new durations only require 4 nails for 130mph wind warranty.

For a quick job like that, there's no benefit to any type of upgraded felt. Whole roof should be tore off and shingled in about half a day and at most, full day.
ParagonEx is offline   Reply With Quote
Old 02-21-2013, 08:56 AM   #14
Newbie
 
Join Date: Feb 2013
Posts: 11
Rewards Points: 0
Default

Roof replacement contract


Thanks, reread the manual and the Duration are 4 nail, read the footnote incorrectly...thought they were six for the 130mph protection like some of the other OC shingles.


So here I am, tomorrow getting my roof replaced and on Sat/Sun potential 3-8 inches of snow....hoping the wind won't be bad with the storm, and the shingles work...glad i am getting the OC Deck Defense High Performance Roof Underlayment.

Last winter was super mild, very little snow, this year another story....that is my life (what is it Murphy's Law)
stack316 is offline   Reply With Quote
Old 02-22-2013, 09:40 AM   #15
Newbie
 
Join Date: Feb 2013
Posts: 11
Rewards Points: 0
Default

Roof replacement contract







stack316 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
What will be typical cost of roof replacement miamikk Roofing/Siding 10 09-11-2011 08:48 AM
Roof replacement specs Joe F Roofing/Siding 8 06-12-2010 11:41 PM
Shingle Roof Replacement Questions - Overlay vs Tear-Off /OC vs Tamko tecboy Roofing/Siding 12 06-28-2009 06:09 AM
Addition and Roof Replacement lebeld Roofing/Siding 4 01-04-2009 06:11 PM
Flat roof - Rolled? - leaks Advice? JJ2001 Roofing/Siding 4 11-19-2006 06:17 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.