Tile work imminent


I'm at the point in my project where I'm ready for the tile to be installed. I'm not doing the install myself as I lack any experience at all in tile work and would like a quality job .

The tile will be large format (18x18 or greater) and placed diagonally in the room.

At the moment, I have two preliminary questions:

1. Does DIYCR etiquette allow me to return to this thread with the inevitable subsequent questions, or should I start a new thread for each instance?

2. As you can see from the attached image, I have a few low spots in the slab (1/4" at its deepest). This image was taken some time back just after the slab was poured.

a: In dealing with the low spots, should SLC be used prior to the tile install or is it better to allow the installer to level it out with thinset during the install?

Thanks!

Tile work imminent-slab-water-mapimg_7507_office-renovation_sized.jpg

rightit is offline   Reply With Quote
Old 11-17-2012, 10:55 AM   #2
DIY staff
 
Join Date: Sep 2009
Location: Kane county,Illinois
Posts: 21,108
Default

Tile work imminent


Keep all your questions in this thread---easier to remember what's what----

Thinset should NOT be used to level the floor----use self leveling compound before starting the actual setting--

The bigger the tile the more critical the floor flatness is---also---the use of tile leveling clips will help aloud lippage----ask if the installer is planning to use them----

SLC requires a primer on the raw concrete to ensure a proper bond---read the label----

You tile setter may (should) insist on doing that part of the job---if done poorly his work will suffer----

__________________
New members: Adding your location to your profile helps in many ways.--M--
oh'mike is offline   Reply With Quote
Old 11-17-2012, 11:38 AM   #3
Member
 
Join Date: Mar 2011
Location: Southeast US
Posts: 244
Default

Tile work imminent


Quote:
Originally Posted by oh'mike View Post
Keep all your questions in this thread---easier to remember what's what----

Thinset should NOT be used to level the floor----use self leveling compound before starting the actual setting--

The bigger the tile the more critical the floor flatness is---also---the use of tile leveling clips will help aloud lippage----ask if the installer is planning to use them----

SLC requires a primer on the raw concrete to ensure a proper bond---read the label----

You tile setter may (should) insist on doing that part of the job---if done poorly his work will suffer----
Thanks for the response. I'd really rather the tile guy do the leveling anyway. Thanks also for the additional info. THe toughest part of this project is bringing in subs for the work I can't (or shouldn't) do myself. More out there who have no integrity than those who do, so it's good to have information that they may not give.

2 other questions --

1. It's been suggested by a few people that Prism is the grout to use...not epoxy but more 'flexible', doesn't support mold or organism growth, etc. Good advice?

2. It's also been said that a good mortar (thinset?) that is a bit expensive should be used, but no brand name was given and I forgot to ask. Any recommendations there?

Again, thanks.
rightit is offline   Reply With Quote
Old 11-17-2012, 11:58 AM   #4
DIY staff
 
Join Date: Sep 2009
Location: Kane county,Illinois
Posts: 21,108
Default

Tile work imminent


Not familiar with PRISM---I use Latacrete epoxy on most of my work----it's good but difficult to use---good for a pro---

Urethane grouts are good----look next door at Contractor talk--link at the bottom of the page----Angus uses it a lot---

Jazman has forgotten more than I will ever know about tile---If he offers advice---listen---Mike---
__________________
New members: Adding your location to your profile helps in many ways.--M--
oh'mike is offline   Reply With Quote
The Following User Says Thank You to oh'mike For This Useful Post:
rightit (11-17-2012)
Old 11-17-2012, 12:53 PM   #5
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 25,538
Default

Tile work imminent


Are you sure you posted the right picture. Looks like a one car garage.
Why do the wall studs not reach the floor?
joecaption is online now   Reply With Quote
Old 11-17-2012, 04:56 PM   #6
Member
 
Join Date: Mar 2011
Location: Southeast US
Posts: 244
Default

Tile work imminent


Quote:
Originally Posted by joecaption View Post
Are you sure you posted the right picture. Looks like a one car garage.
Why do the wall studs not reach the floor?
An old photo, taken while the slab was curing. I took it to 'map' the low spots in the slab. As for the studs, I placed the steel supports and removed the bottom 16" of the wall to accomodate the concrete. After the concrete had some cure time, I ponied the bottom.
rightit is offline   Reply With Quote
The Following User Says Thank You to rightit For This Useful Post:
oh'mike (11-17-2012)
Old 11-19-2012, 06:36 PM   #7
Member
 
Join Date: Mar 2011
Location: Southeast US
Posts: 244
Default

Tile work imminent


Back again with a few more questions . The image below shows that the durock is a bit higher than the sheetrock. About 3/8" on the left (valve side), and just a bit on the right. What might be the best way to deal with this that will look good (great, even...coving, some kind of trim, filler between rock and tile where it meets the wall?)?

The tile in the shower is going to the ceiling. I'd like the wall tile to stop at least a few inches beyond the CB and onto the rock. I'm not tiling all walls because I'll likely be enlarging my electrical service later and will need to get into the wall (on the right side).

I guess I could tile all the walls and remove and replace whatever tiles necessary, but I'd like to avoid that if possible:


Tile work imminent-tile-img_9534.jpg

--------------------------------------------


2. How to handle the bottom of durock/#15 felt? I have enough felt hanging into the receptor to leave 1/2" or more.

The 2 questions:

1. How much felt should I leave hanging below the durock?
2. What sealant (if any) should be applied and how and where (i.e., just the felt to the flange, felt to the durock,...)?

I guess any moisture that occurs should have a planned egression, but I'm not sure what?


Tile work imminent-tile-img_9531.jpg

Comments appreciated. Thanks!

rightit is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Need advice in fixing "contractor's" botched shower floor tile job toocheaptohire Tiling, ceramics, marble 5 10-15-2012 02:31 PM
Tile shower leaking gregsenne Plumbing 9 10-02-2012 09:00 PM
tile work oceandweler Kitchen & Bath Remodeling 8 06-21-2011 06:06 PM
tile work visualeye Tiling, ceramics, marble 3 09-20-2010 08:00 PM
Tile Cutter vs. Tile Saw jamiedolan Flooring 8 11-09-2008 03:17 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.