Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Flooring > Tiling, ceramics, marble

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 02-24-2012, 04:08 PM   #1
Just a DIY guy
 
Join Date: May 2011
Location: Southern California
Posts: 297
Rewards Points: 0
Share |
Default

"Temporary" tile job?


Due to a slab leak we are re-doing our powder room. We have picked out a very "hip" porcelain tile, that will really make the small bath "pop."
We are on a slab foundation, and there is bare slab in the powder room.

Outside the powder room, we have Saltillo tile, which is much thicker than the porcelain we want to use in the powder room. Eventually, we want to replace the Saltillo tile, probably with more porcelain tile, but probably not the same as we are using in the powder room, since that tile is a bit too "hip" for the main part of the house.

Questions:
First, is there a way to put down a tile floor so that it is solid, but if it needs to be redone, it can be removed without massive effort? (we may want to change out the powder room tile when we decide to replace the Saltillo) Would using Ditra ease our removal challenge?

Second, is it bad form to have the powder room tile slightly lower than the Saltillo tile in the hallway? Does Ditra increase the height of the install?

Third, what is used to transition these different tiles (Saltillo and porcelain)? A strip of the powder room tile? Or something different altogether?

Fourth, do we need to remove the bottom of the drywall to tile the bath? It used to have carpet, and has some baseboards that I will remove. But I'm not sure how close I'm supposed to go to the drywall, or if I'm supposed to go under the drywall.

Thanks for the help.


Last edited by M3 Pete; 02-24-2012 at 04:13 PM.
M3 Pete is offline   Reply With Quote
Old 02-24-2012, 07:58 PM   #2
long island, NY
 
Join Date: Jul 2009
Location: long island, ny
Posts: 382
Rewards Points: 0
Default

"Temporary" tile job?


I'll preface this by saying I'm not a pro... just a DIY'er with decent tiling experience....

I'm not so sure that ditra will improve the ease of removal Tile is a PIA to remove... if you're certain you intend to remove it in a few years, maybe choose a different flooring type that is easier to remove?

Maybe I'm just a sloppy non-pro, but I honestly believe that if you put a marble threshold between the two rooms, you would barely notice the 1/4" difference between floors.... and of course ditra adds a bit to the height... not sure of the average amount... probably between 1/8 and 1/4"... so the difference would likely be between 0-1/8".

Not sure if I understand the drywall question. Generally, you're tiling to the wall and then replacing the baseboard.

diy'er on LI is offline   Reply With Quote
Old 02-24-2012, 08:14 PM   #3
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 26,376
Rewards Points: 80
Default

"Temporary" tile job?


Since it's temporary I'd use something like Allour flooring it's sold in Home Depot. Looks like tile but does not get glued directly to the floor and is very water resistant.
Simple to install with just a pair of tin snips.
joecaption is online now   Reply With Quote
Old 02-24-2012, 08:17 PM   #4
Member
 
Join Date: Dec 2011
Location: zentral Iowa
Posts: 1,203
Rewards Points: 4
Default

"Temporary" tile job?


I gather that display rooms are laid on roofing paper. I'm not sure how well this holds up, but hopefully you'll let us know.
cleveman is offline   Reply With Quote
Old 02-24-2012, 08:18 PM   #5
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 26,376
Rewards Points: 80
Default

"Temporary" tile job?


http://www.homedepot.com/hdus/en_US/...panel_2010.pdf
joecaption is online now   Reply With Quote
Old 02-27-2012, 03:01 PM   #6
Just a DIY guy
 
Join Date: May 2011
Location: Southern California
Posts: 297
Rewards Points: 0
Default

"Temporary" tile job?


thanks for the responses. I will probably just tile it up and hope we do not change it later.

Just to confirm, you drywall first, then tile up to the drywall, then put on your base molding (baseboards), right?

Or do you put on the baseboards and tile up to them?

M3 Pete is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Solving discontinued tile issue timbo59 Flooring 14 10-03-2012 08:03 PM
Asbestos Removal, Porcelain Tile Installation jimbriam Flooring 15 01-30-2012 01:46 PM
Removing Tile Over Hardwood: Need Help With Kitchen/Bath Creelove Flooring 3 02-01-2011 06:03 AM
Laying Subfloor for New Bathroom Question rjschwar Kitchen & Bath Remodeling 3 06-25-2010 03:06 PM
Preping for ceramic tile install leroyme Flooring 21 11-29-2007 03:31 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.