Well Its started. 1/2 the cabinets are down 60% of the floor is up.
The plan:
-Replace old cabs with new stock ones
-Tile or laminate wood flooring
- Wire in under cab light and accent lighting above cabs
That sound simple that way
I ended up using a rotary hammer to get the tiles up off the slab, set it to hammer and went at it about 5 hours to get done what I did.
tried a "the stripper" from the rental place non effective at all.
rot/hmmr the way to go some tiler popped whole some cameout in schrapnel like pieces.
WEAR saftey glasses!! I had trickels of blood from forehead and many places on arms. It comes at you in a hurry
SO I need opinions should I refloat the floor and reinstall tile or laminate hardwood?
I only consider the wood due to the damage to the slab and the amount of work its going to take to prep for new tile.
I need an easy way to get the thinset off the slab I figured an angle grinder with some form or wheel/wire. I know I need some thing thats not gonna clog up and be kinda speedy.
http://i81.photobucket.com/albums/j2...2/IMG_2355.jpg