Basement Shower Remodel Question


Hi all,

I'm going to remodel my basement shower. The shower was done only about 10 years ago, but it was done wrong. I have water leaking out of the bottom of the shower and it's corroding the studs.

I plan on pulling up the floor and one row of the 6"x8" wall tiles. I will then lay a new preslope, liner and mud bed. I have two questions...

1) The drain pipe is as old as the house and thats about 60 years. I'm 99% sure this is a cast iron pipe. Do you think this drain pipe needs replacing? If so, would I need to jackhammer the sub floor to get to it and have a plumber come in a attach a PVC drain? Is this even possible?

2) The shower has one wall that is solid concrete (it's a basement). This wall has two layers of tile on it (the original tile and the tile set 10 years ago). How will I attach the new shower liner to this concrete wall? Can I just lay the liner up against the concrete wall and attach some durock on top of it? Then tile?

Thank you in advance.

Advertisement

mdsnj is offline   Reply With Quote
Old 02-25-2010, 11:30 AM   #2
Member
 
Join Date: Nov 2009
Location: Wisconsin
Posts: 96
Rewards Points: 75
Default

Basement Shower Remodel Question


Quote:
Originally Posted by mdsnj View Post
1) Do you think this drain pipe needs replacing?
Probably
If so, would I need to jackhammer the sub floor to get to it and have a plumber come in a attach a PVC drain?
Probably
Is this even possible?
Definitely
Quote:
Originally Posted by mdsnj View Post
2) The shower has one wall that is solid concrete (it's a basement). This wall has two layers of tile on it (the original tile and the tile set 10 years ago). How will I attach the new shower liner to this concrete wall? Can I just lay the liner up against the concrete wall and attach some durock on top of it? Then tile?
You're pretty lost here. The level of knowledge that you have is simply not congruent with the scale of this job. Sorry.

Advertisement

Dairylander is offline   Reply With Quote
Old 02-25-2010, 11:57 PM   #3
Member
 
Join Date: Feb 2009
Location: Seattle, Washington
Posts: 344
Rewards Points: 250
Default

Basement Shower Remodel Question


Could be the shower drain itself that was installed wrong.
The pipe may not need replacing.
Could be that the liner should have never been installed. Sounds more like a job for a Kerdi membrane.
__________________
Work is for those who can not fish.
Mop in Hand is offline   Reply With Quote
Old 02-27-2010, 01:16 PM   #4
Tileguy
 
Bud Cline's Avatar
 
Join Date: Mar 2006
Posts: 10,494
Rewards Points: 2,636
Default

Basement Shower Remodel Question


YOU ARE IN LUCK!

This a is a job for Schluter KERDI. Check out the Schluter offerings then come back with your questions.
http://www.schlutersystems.com
__________________
XXX
Bud Cline is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
need help on shower remodel kyle450rider Kitchen & Bath Remodeling 4 06-05-2009 05:58 AM
bathroom shower in basement along foundation wall jeeper Building & Construction 1 04-16-2009 08:20 PM
Basement shower install howto greight Building & Construction 4 04-13-2009 05:19 AM
Shower Arm Question brakea Plumbing 2 01-02-2009 06:58 PM
Remodel style recessed light code question bjstewa Electrical 8 05-22-2008 10:25 PM




Top of Page | View New Posts