Quote:
Originally Posted by woodworkbykirk
get it tiled asap and get the plumber to hook up the fixtures
|
thanks. but 1st of all, the fixtures (minus the cover plates) are done before the final cosmetics, including tile. 2nd of all, i am the plumber. all the plumbing is done already.
i had been using the shower when it had just the studs around, with vapor barrier used to block spray and sprinkle around.
it will be a couple weeks before i can put the tile cause the final cosmetic i don't like to do myself, i.e. will outsource.
i do have another shower in the basement