What's up people;

I am in the process of renovating my second floor bathroom, and I am in need of some advise.
The last owner change all the hot water pipes to copper but left the cold water with galvanized pipes.
So the cold water pipes are rusting out and need to be replace.
The pipe for the cold water that run upstairs looks to be 1"- 1/4 and the hot water 1/2" coming off a 3/4" main.

What I would like to know is; Should I run a 3/4" pipe to the second floor and then branch it out into 1/2" pipes for all the fixtures or should I run 1/2" straight up from the basement to the second floor?
Here are some pics of the set up. Any help would be appreciated Thanks.
Attached Thumbnails
Replacing galvanized with copper pipes.-p2100038.jpg   Replacing galvanized with copper pipes.-p2100044.jpg   Replacing galvanized with copper pipes.-p2100040.jpg   Replacing galvanized with copper pipes.-p2100049.jpg   Replacing galvanized with copper pipes.-p2100047.jpg  


Twinvtec is offline   Reply With Quote
Old 02-10-2009, 09:48 PM   #2
Member
 
Join Date: Jun 2008
Posts: 1,264
Default

Replacing galvanized with copper pipes.


TwinVtec:

You're always going to be better off with the 3/4 inch pipe running upstairs.

A 3/4 inch pipe can deliver the same flow capacity as two 1/2 inch pipes, so you can supply full flow to two upstairs plumbing fixtures at the same time.

That way, the shower won't scald you if someone flushes the toilet.

Use a dia-electric coupling between the old iron piping and the new copper piping.

__________________
Bashing my head against the walls in some of the internet's finest chat rooms.
Nestor_Kelebay is offline   Reply With Quote
Old 02-11-2009, 06:57 AM   #3
Remodeling Contractor
 
Join Date: Dec 2008
Location: Sandy Hook, CT
Posts: 3,590
Default

Replacing galvanized with copper pipes.


Using 3/4" is not always a best solution. I changed my 1/2" to 3/4" and now it takes forever to get hot water out of the sink. Reason, more water in 3/4 to cool, more water to move before it draws from the water heater. But I plan to fix it by adding a instant tank heater and still keep the 3/4 for better flow to the multi-head shower. So I agree use the 3/4, just wanted to add a downside you may need to consider. Also may look into a recirculating pump.
Bob Mariani is offline   Reply With Quote
Old 02-11-2009, 11:03 AM   #4
Member
 
Join Date: Sep 2006
Posts: 1,670
Default

Replacing galvanized with copper pipes.


Not sure why the line was increased so much after the meter. 3/4" would be the best bet to supply the upstairs fixtures, with 1/2" take-offs for each fixture. I would try to get rid of all the galvanized pipe since I see no reason to keep any of it. Having a small line off the meter, and then increasing it as much as they did, makes no sense.
__________________
If you have never made a mistake, you haven't done much.
majakdragon is offline   Reply With Quote
Old 02-11-2009, 02:33 PM   #5
Member
 
Join Date: Feb 2009
Posts: 35
Default

Replacing galvanized with copper pipes.


Thank You guys for all the replies.
I am going to change the galvanized pipe and replace it with copper.

The line that comes in from the meter is 1" and all the others are 3/4" and then they branch out into 1/2" copper pipes for the hot and cold water for the first floor.

They also ran 1/2" copper pipes for the hot water to the second floor but left the old ones for the cold. I really don't know why they did that, maybe because they did not wanted to break the walls or something.
Twinvtec is offline   Reply With Quote
Old 02-15-2009, 08:26 PM   #6
Member
 
Join Date: Feb 2009
Posts: 35
Default

Replacing galvanized with copper pipes.


Hello everyone;

I just finished replacing the old galvanized pipes, here are some pics.Tell me what you guys think, not to bad for my first time.
Attached Thumbnails
Replacing galvanized with copper pipes.-p2140063.jpg   Replacing galvanized with copper pipes.-p2150089.jpg   Replacing galvanized with copper pipes.-p2150088.jpg   Replacing galvanized with copper pipes.-p2150090.jpg   Replacing galvanized with copper pipes.-p2150093.jpg  


Last edited by Twinvtec; 02-15-2009 at 08:32 PM. Reason: .
Twinvtec is offline   Reply With Quote
Old 02-15-2009, 09:56 PM   #7
Member
 
Join Date: Apr 2008
Location: Western Masschusetts
Posts: 575
Default

Replacing galvanized with copper pipes.


yea, real nice work man. i recently did the exact same job in my house. replaced a long run of totally corroded galvanized pipe wiht copper.
really satisfying looking at all the gleaming work.

one thing, if you care at all about looks, immediately after you melt the sotter, take a wet rag to the pipe/fitting area and rub it hard. it will clean all the flux and burn marks off it. (wear gloves and be careful.)
wombosi is offline   Reply With Quote
Old 02-16-2009, 10:50 AM   #8
Member
 
Join Date: Feb 2009
Posts: 35
Default

Replacing galvanized with copper pipes.


Quote:
Originally Posted by schmolze View Post
yea, real nice work man. i recently did the exact same job in my house. replaced a long run of totally corroded galvanized pipe wiht copper.
really satisfying looking at all the gleaming work.

one thing, if you care at all about looks, immediately after you melt the sotter, take a wet rag to the pipe/fitting area and rub it hard. it will clean all the flux and burn marks off it. (wear gloves and be careful.)

Thank you for the reply. This was my first time doing this type of work so it was a learning experience. I learned about wearing gloves the hard way after I burned my little finger on my right hand...lol... but yes the next time I will use a wet rag to clean up all weld spots. Thank You.
Twinvtec is offline   Reply With Quote
Old 02-16-2009, 10:57 AM   #9
Member
 
Join Date: Sep 2006
Posts: 1,670
Default

Replacing galvanized with copper pipes.


Nice job. Glad you didn't have any problems. I always wear a brown cotton glove when soldering. Works well for wiping the joints while the solder is still liquid. I go back later and wipe the joints with a wet cloth to remove the melted flux. Problem I have found with using a wet rag while the joint is hot, is it immediately solidifies the solder.
__________________
If you have never made a mistake, you haven't done much.
majakdragon is offline   Reply With Quote
Old 02-16-2009, 05:33 PM   #10
Newbie
 
Join Date: Jan 2009
Posts: 26
Default

Replacing galvanized with copper pipes.


Quote:
Originally Posted by Twinvtec View Post
They also ran 1/2" copper pipes for the hot water to the second floor but left the old ones for the cold. I really don't know why they did that, maybe because they did not wanted to break the walls or something.
I did that in my house because the galvanized hot water pipes were in much worse condition than the cold water pipes. Also the hot water pipes were running all over the house instead of running directly to the places that needed hot water. The water to my shower was heating 30 feet of steel pipe instead of 12 feet of copper pipe for example.

Over the years whenever I busted open a wall that had a cold water galvanized pipe in it, I would replace it with copper. Then ten years later I finally got around to replacing the rest of the galvanized plumbing with copper. I also added some convenient gate valves and freezeless outdoor faucets (or sillcocks, or bibs, whatever your local vernacular calls them).

This is one DIY project that was more fun to do spread out over several years.
scowl is offline   Reply With Quote
Old 02-22-2009, 05:08 PM   #11
Member
 
Join Date: Feb 2009
Posts: 35
Default

Replacing galvanized with copper pipes.


Thank you all for the replies;

It had been 2 weeks and no water leaks that is a good sign.
Now its time to move on with my next project, the bathroom remodel.
I am going to remodel the upstairs bath, it is going to be a complete remodel from the floors,walls and all the hardware.
I am going to be posting my progress in the construction forums under Complete bathroom remodel.
Here are some pics of what I am working with.
Attached Thumbnails
Replacing galvanized with copper pipes.-p2110057.jpg   Replacing galvanized with copper pipes.-p2110058.jpg   Replacing galvanized with copper pipes.-p2110060.jpg   Replacing galvanized with copper pipes.-p2110061.jpg  
Twinvtec is offline   Reply With Quote
Old 02-22-2009, 08:38 PM   #12
Member
 
Join Date: Jun 2008
Posts: 840
Default

Replacing galvanized with copper pipes.


boy that bath sur is purty now,,,why remodel?? where did the toilet tank go?? Is it up above??Never saw one like that!!
4just1don is offline   Reply With Quote
Old 02-22-2009, 10:22 PM   #13
Member
 
Join Date: Sep 2006
Posts: 1,670
Default

Replacing galvanized with copper pipes.


4just1don. I did a doubletake since you rarely see a Sloan valve in residential plumbing. Looks like a 1" supply line also. Nothing "water saving" about this set-up unless the flow is adjusted real low.
__________________
If you have never made a mistake, you haven't done much.
majakdragon is offline   Reply With Quote
Old 02-23-2009, 03:48 PM   #14
MasterPlumber
 
ironrange's Avatar
 
Join Date: Feb 2009
Posts: 33
Default

Replacing galvanized with copper pipes.


Regarding the upstairs bathroom group. You have one toilet, one lav, one bathtub with a shower I presume. You have a total of 6 fixture units. If your water pressure is between 40 and 60 lbs and the run from the basement is less than 150 feet(which it is of course) code says you can use 1/2" to all three fixtures. 3/4" would be overkill and does not supply greater pressure to your fixtures in this case.
ironrange is offline   Reply With Quote
Old 02-23-2009, 04:45 PM   #15
KGP
Member
 
Join Date: Feb 2009
Location: NJ
Posts: 51
Default

Replacing galvanized with copper pipes.


I am in the midst of the same project... the bathroom even looks the same, haha! I replaced with Pex and everything is holding so far. I have to rock tomorrow and start taping, then comes the tile! Here are a few pics of my project. Before and during (since I am not actually finished yet)

What amazed me the most about this project was how everyone talks about how bad the economy is... yet I could not get a contractor for ANY trade to show up other than the "Demo" guy. Although I am quite handy... I just did not feel like doing yet another bathroom in my house myself so I asked my wife to handle the job for me by getting prices ect... again, the ONLY guy that even showed up was the demo guy (pictured). My wife tricked me, knowing I could do the work but as long as it was "started" for me, as there was no way in hell I was ripping that thing out and carying that tub down... even with help... man, she dupped me. haha!
Attached Thumbnails
Replacing galvanized with copper pipes.-bath1-sm.jpg   Replacing galvanized with copper pipes.-bath2.jpg   Replacing galvanized with copper pipes.-bath3-sm.jpg   Replacing galvanized with copper pipes.-bath13-sm.jpg   Replacing galvanized with copper pipes.-bath14-sm.jpg  



Last edited by KGP; 02-23-2009 at 04:48 PM.
KGP is offline   Reply With Quote
Reply

Tags
bathroom remodel plumbing, copper, galvanized


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Burying exposed copper pipes ryan_s HVAC 1 11-20-2008 07:20 PM
Replacing pipes in bathroom, need advice Steelmesh Plumbing 7 11-04-2008 11:30 AM
copper sink and standard drain pipes chefnmusic Plumbing 3 10-11-2008 08:18 AM
replacing rectangular duct with 6" pipes peso HVAC 4 06-05-2008 08:43 PM
difference b/ween L (blue - expensive) and M (red - cheap) copper pipes amakarevic Plumbing 4 07-31-2007 05:28 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.