Getting ready to tear my current cabinets and sink out and install new. I have a couple questions about what is installed at the moment. Currently I have copper piping, which is going to be cpvc with adapted to copper that we will be cutting (yes, I know copper is better, but my dad and I don't do copper well).
If you look at the first picture, it shows "4" copper pipes installed. Looking at the 2nd, you can see why (the hot has the same thing with the T going out the other side), and the third shows the "2nd" pipe with a cap on the top. My plan is to have one single cpvc for each cold and hot, with a steel braided hose for each. My question is why is this here? And since it is currently like this, should we be able to do it the way I describe?
The last picture shows my drain to the wall. We believe it drains to cast iron. I'll be putting new pvc drain pipe in. Should I have any problems with this? What other pieces will I need for this? I am assuming/hoping that everything screws off easily, but the sawzall batteries are charging just in case.
If you need anymore info, please ask, and I will do my best to answer.
If you look at the first picture, it shows "4" copper pipes installed. Looking at the 2nd, you can see why (the hot has the same thing with the T going out the other side), and the third shows the "2nd" pipe with a cap on the top. My plan is to have one single cpvc for each cold and hot, with a steel braided hose for each. My question is why is this here? And since it is currently like this, should we be able to do it the way I describe?
The last picture shows my drain to the wall. We believe it drains to cast iron. I'll be putting new pvc drain pipe in. Should I have any problems with this? What other pieces will I need for this? I am assuming/hoping that everything screws off easily, but the sawzall batteries are charging just in case.
If you need anymore info, please ask, and I will do my best to answer.