We recently had a flood issue in our laundry room. The mess and problem have been cleaned up, but the floor and drain pan need to be reinstalled.
Here is a picture of what you see now. We are going to have a plumber install the new drain pan properly (because that was part of the initial problem), but I need to know what order to go in to make his job easy. Install new floor up to outer circumference of drain? Is the drain fitting going to have to be removed to install the pan? If so, does that effect the floor installation? Basically, my question is what order things have to be done in to have this work out perfectly and how close to the hole the flooring should go.
Thanks in advance!