Laying out plumbing for basement finishing - pictures included


Hello all. I am just about ready to start on my basement. Phase 1 will be building the laundry room, currently the laundry is on the main level. The basement is already roughed-in for a full bath, and has a functioning ejector pit.

Here is the layout of the laundry room, the ejector pit will be in the "closet" within the laundry room. On the near side of the wall (where the broom is) there will be a countertop with a sink in what-will-be the bar area.



The area here is where the washer and dryer will sit, with the washer on the left, nearest the ejector pit.



Here is my diagram of what I think I need to accomplish as far as routing the PVC for drainage. Please excuse my awesome MS-Paint skills. All PVC will be 2" - which is also what the vent and waste pipe sizes are.


Is this correct? Do I need to tie in another vent to the washer drain?


Turning around, you can see the area the bathroom will be:


It is already roughed with a shower drain, 4" pipe for toilet, and 4 vents: shower, Floor Drain (for HVAC)., Toilet, LAV.


I was planning on putting the wall in front of those vent pipes. Will this leave me enough room to install a toilet?





Finally - I have water lines running very near by in 3/8", 1/2" and 3/4". What size should I use to supply the washer and sink? Will 3/8 be enough? Would 3/4 be overkill? Any other useful suggestions? Thanks in advance. I like to get my entire plan together before I start building and have to redo/undo things.
hyunelan2 is offline   Reply With Quote
Old 10-19-2010, 11:55 AM   #2
Jack of all - master none
 
hyunelan2's Avatar
 
Join Date: Aug 2007
Location: SW Suburbs of Chicago
Posts: 1,153
Default

Laying out plumbing for basement finishing - pictures included


Ran into the plumbing inspector. I asked him and he drew me a little diagram, which I reproduced. Turns out my washing machine diagram has a "S" trap on it, which is illegal. This way works:

hyunelan2 is offline   Reply With Quote
Old 10-19-2010, 09:54 PM   #3
Newbie
 
Join Date: Oct 2010
Posts: 1
Default

Laying out plumbing for basement finishing - pictures included


The standard size water lines used to feed any of the fixtures you mentioned are 1/2". If you are planning on running one set of hot and cold to the entire set of fixtures it may be best to run 3/4 from the source into the laundry/bath area and then split off of it with a 3/4"x3/4"x1/2" T at each intersection and use a 3/4"x1/2"x1/2" T at the last intersection so that a 1/2" line runs to each fixture but only where each one branches off of the main run. We use pex where I come from and I would highly recommend it. Even if you don't have the crimp tool you can get crimp rings that are easily crimped with standard tools or many hardware stores (ACE etc..) rent the tools by the day/half day and it is such a time savings over gluing or soldering. Also about the toilet the standard rough in setback from the center of the 4" drain to the stud wall is 12". This gives enough room between the sheetrock and the toilet tank so they are close at the back but not quite touching once you are finished. Another useful suggestion may be that I could see a slight bit of negative slope on your vent pipes in the drawing. I am not sure if this was intentional or not but you do need this. It must flow uphill from the fixture to the vent stack so as to allow any water that gets into that vent from rain etc. to flow back down into the drain! Good luck, this looks like it will be a nice space when finished. James.
jim9944 is offline   Reply With Quote
Old 10-19-2010, 10:03 PM   #4
Member
 
Join Date: Aug 2010
Posts: 601
Default

Laying out plumbing for basement finishing - pictures included


In my code, no more than 1/3 of the total length of the vent line can be horizontal. The way we get by that is to upsize one size, you lose the horizontal limitations when you do. I would run all vents in 2" to save from possible inspector issues down the road. Also put the cleanout on the washer vent above the flood level of the box, its unnecessary where it is at (but you can leave it too, can't have enough cleanouts)

Last edited by the_man; 10-19-2010 at 10:05 PM. Reason: added to
the_man is offline   Reply With Quote
Old 10-19-2010, 11:22 PM   #5
call me E
 
TheEplumber's Avatar
 
Join Date: Jul 2010
Location: Idaho
Posts: 6,182
Default

Laying out plumbing for basement finishing - pictures included


A 10.5" roughin is about as close as you can get for a water closet. It appears that is what you have. This will take a special order for your WC, but not uncommon. If you push the wall back 2" so you have 12.5" from the framing to center of closet stub you can use a typical toilet
TheEplumber is online now   Reply With Quote
Old 10-20-2010, 06:01 PM   #6
Member
 
Join Date: May 2010
Location: Rosedale,Md
Posts: 168
Default

Laying out plumbing for basement finishing - pictures included


Toilet rough-ins are taken from the FINISHED wall line.
braindead is offline   Reply With Quote
Old 10-20-2010, 07:14 PM   #7
Jack of all - master none
 
hyunelan2's Avatar
 
Join Date: Aug 2007
Location: SW Suburbs of Chicago
Posts: 1,153
Default

Laying out plumbing for basement finishing - pictures included


Thanks for the replies everyone. A few remarks:

Yes, I will make sure the horizontal vents have the correct slope, that was just MS-Paint throwing it off. I also think I will be using 2" for everything - it just seems easier. It's not that much plumbing that the 2" PVC and fittings will make a much more expensive project.

In my toilet research, I am finding that 12" is standard rough-in dimension. The tape line on the floor represents the finished wall, but I still need to push it back about 2" to get an off-the-shelf toilet to fit. Should I just "notch" the 2x4s for the plate board to get it to slide back, then "notch" the studs to fit around the horizontal vent PVC? - Basically frame around the existing PVC? Should I just cut off the vents and frame, then rebuild the vents with the studs in place?
hyunelan2 is offline   Reply With Quote
Old 10-20-2010, 07:22 PM   #8
Jack of all - master none
 
hyunelan2's Avatar
 
Join Date: Aug 2007
Location: SW Suburbs of Chicago
Posts: 1,153
Default

Laying out plumbing for basement finishing - pictures included


Nevermind. 30 seconds at Home Depots website and I see that 10" rough-in Toilets are commonly available. There are not as many (66 10" vs. 722 12"), but there are enough to choose from.
hyunelan2 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Need Patio Advice - Pictures Included kyassassin Landscaping & Lawn Care 45 05-14-2009 01:41 PM
Vaulted Ceiling - (Pictures included) How to do it? peabodyn Remodeling 7 03-29-2009 11:18 AM
Concrete/Mortar issues First time home owner Pictures Included stefonroman Building & Construction 2 03-01-2009 07:12 AM
Broken roof truss/support help needed please! Pictures included! MrShadetree0222 Building & Construction 3 11-04-2008 07:17 PM
Basic Switch wiring question; Dimmer to Toggle switch (Pictures included) inspectator Electrical 8 08-07-2007 01:19 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.