finishing a basement bath - tie in to ejector pump vent?
I am getting ready to finish my basement bath - have questions about venting. The house is less than a year old. The plumbing is roughed in for a full bath but I am only going to do a half bath. There is a 3" pipe out of the floor for a toilet, and another 2" pipe coming up for the sink drain. There there is gravel filled box - I haven't dug in but there has to be a line for the shower drain. There is also an ejector pump - one line coming out with a check valve connecting to the main drain, and another line coming out (vent).
The ejector pump vent goes up through the floor, but the vent is teed off and goes back into the basement floor near the floor drain by the furnace. I have to assume that this is the vent for the floor drain? I thought it was a no-no to tie into the ejector pump vent though?!?!? My plan is this: - dig down and make sure the shower drain is capped off well - tie sink into existing drain / "wet vent" for toilet - tie vent into existing vent for ejector pump (assuming it's ok to tie in) Does this sound OK??? I am Peoria, IL so as far as I know we don't have any weird code requirements. |
|
|
|
|
|
#2 |
|
Plumbing Contractor
Join Date: Apr 2008
Posts: 60
|
finishing a basement bath - tie in to ejector pump vent?
Hi AJ:
You were correct first time. Connecting into the ejector pump is a no-no!! I would take that 2" pipe for sink, stub out 1.5" pipe for lavatory sink and then continue on full size 2" vent to nearest 2" vent or larger upstairs or in attic (acts as vent for sink and WET vent for toilet)....and while running that 2" vent for 1/2 bath, pick up the vent that SHOULD NOT BE connected to ejector vent And since house is only about a year old, be sure to check around entire basement..there should be a 2" FUTURE vent stubbed/capped for you to connect on too!! That capped future vent is a code requirement in my area...*cross fingers* it is in your area, too...and that you can find it!! If future vent not found, then need to run the 2" vent like I suggested and cap the ejector vent where you cut out illegal connection. Good luck with it all!! Post back if any other questions. |
|
|
|
|
|
#3 | |
|
Doing it myself
|
finishing a basement bath - tie in to ejector pump vent?Quote:
__________________
Journeyman Plumber |
|
|
|
|
|
|
#4 |
|
Plumbing Contractor
Join Date: Apr 2008
Posts: 60
|
finishing a basement bath - tie in to ejector pump vent?
NOPE...all vents connect as normal and then penetrate the roof with one 3" vent as any state I have plumbed in...??
Why...does your state code allow someone to connect into the ejector vent..? All codes are different, for sure.....so is this the case..?? |
|
|
|
|
|
#5 | |
|
Doing it myself
|
finishing a basement bath - tie in to ejector pump vent?Quote:
How do you decide where to put it? You do have maximum horizontal lengths for vents, right?
__________________
Journeyman Plumber |
|
|
|
|
|
|
#6 |
|
Plumbing Contractor
Join Date: Apr 2008
Posts: 60
|
finishing a basement bath - tie in to ejector pump vent?
Hi Alan:
The 2" future vent is required in all new homes. Code (in my area) only requires that I leave a 2" future vent with drip leg on it and that I mark it as a FUTURE VENT somehow (I use permanant marker and just write FV on it)....does not matter where we leave it as long as it is 2". In my area, I can run a 2" vent with a full bathroom on it up to 150 linear feet...so pretty much anywhere future vent is accessible works for most homes. Hey, just wanted to answer your question...been having fun with some of the questions is all. I can see you are a pretty sharp bunch over here at DIY chatroom...looking forward to working with you guys on occassion... ![]() I am not sure of all the proper etiquette for these kind of chatrooms...so bear with me if I do something stupid. I am new to this. Take care |
|
|
|
|
|
#7 |
|
Member
Join Date: Mar 2008
Posts: 350
|
finishing a basement bath - tie in to ejector pump vent?
Here In colorado now that we switched to the IPC they let you tie into the 2" ejector pump vent, It just has to be 6 inches above the flood rim.
__________________
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts. , To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts. , To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts. , To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts. |
|
|
|
|
|
#8 | |
|
Doing it myself
|
finishing a basement bath - tie in to ejector pump vent?Quote:
__________________
Journeyman Plumber |
|
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Do I need a HVAC return vent in basement? | westing | HVAC | 12 | 01-28-2009 01:09 PM |
| Basement finishing | smallcrpt | Remodeling | 18 | 11-12-2007 06:27 AM |
| How to 'start' finishing the basement... | mcvane | Building & Construction | 18 | 06-04-2007 09:28 AM |
| Finishing Basement, How to run a heat duct? | hyper | Remodeling | 6 | 02-23-2007 04:46 PM |
| Roughed in basement vent question | jeffgator | Plumbing | 5 | 01-27-2007 12:48 PM |