Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Plumbing

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 04-28-2011, 09:54 PM   #1
Newbie
 
Join Date: Jan 2010
Location: New York
Posts: 13
Rewards Points: 0
Share |
Default

Bathtub Waste Exit Relocation


Working on a house in NY built in 1948. Sencond floor bathtub was replaced with a newer. The old bathtub waste exit was at point A. Builders cut into upper portion of joist to accomodate pipe to exit point. New tub bed sits lower. Necessary to connect waste exit at point B of "venting system". The "venting system" depicted does, in fact, cut into the top of the first floor.

1. Is it ok to replace the entire length of bathtub vent pipe (the first vertical pipe in image) ?
2. If "1." is yes, is it ok to replace with PVC ?
3. Replace only the section near area B of the bathtub vent pipe by cutting a section in that area and using some type of coupling system to tie into the metal portion above ?
4. If "3." is yes, then what type of coupling system do you recommend.
5. It the bathtub vent pipe even necessary ? I.e. is it ok just to tie into section B, ommitting the entire pipe section above?
6. Would you provide any other recommendation/suggestions

Thank you.
Attached Thumbnails
Bathtub Waste Exit Relocation-plumbing.jpg  


Last edited by nixplix; 04-28-2011 at 11:19 PM. Reason: better pic
nixplix is offline   Reply With Quote
Old 04-29-2011, 07:45 AM   #2
Long-Time DIYer
 
Mike Swearingen's Avatar
 
Join Date: Mar 2005
Location: On Albemarle Sound In Northeastern NC
Posts: 1,460
Rewards Points: 0
Default

Bathtub Waste Exit Relocation


I'm not a pro plumber, but until one answers you, here are my suggestions to begin with....
A. Contact your local Building Inspection Department for local code guidance for drain/waste/vent systems and plumbing inspection and permitting requirements. If you ever sell this property, you want to have those permits (and inspection approvals) on file.
B. If local code permits it, you should be able to use PVC to replace parts of the metal d/w/v system.
C. A "mission" coupling would be best and probably required. This coupling has a stainless steel sleeve over a neoprene rubber sleeve with ss clamps to connect plastic d/w/v to metal d/w/v.
D. All fixtures and drains require vents of a speciifed size within a limited distance. I dont think that you can eliminate it.
Good Luck!
Mike

Mike Swearingen is offline   Reply With Quote
Reply

Tags
bathtub, plumbing, stack vent, waste exit


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Loose cleanout cap = waste spillage in soil? Roadrider Plumbing 12 03-01-2011 07:04 AM
Bathtub Drain -- Without Overflow Waste Trap sabinh Plumbing 6 02-15-2010 10:24 AM
Angled bathtub waste shoe JacobSteelsmith Plumbing 6 07-19-2009 09:35 PM
Preparing to install Kerdi on bathtub surround DIY-Renovator Flooring 18 07-17-2008 10:42 AM
Help with ID'ing bathtub sound... DIY-Gal Plumbing 12 02-10-2007 05:45 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.