I'm having laminate flooring installed in my house. they poured cement on my subfloor saying they needed to level it out when I woke up this morning it was all cracked up. I think they used too much water in the mixture. Am I wrong? I could really use some info on this. I need to know what's going on. Thanks

Advertisement


Last edited by Nosmos10; 05-06-2011 at 06:31 PM. Reason: Add on
Nosmos10 is offline   Reply With Quote
Old 05-06-2011, 06:39 PM   #2
NACE Coating Inspector
 
mustangmike3789's Avatar
 
Join Date: Apr 2011
Location: Florida
Posts: 524
Rewards Points: 500
Default

Why would the cement they poured crack? In a day!


was this cement or a leveling compound. it could be cracking from too much water or not enough water. if it was a cement product and they didnt wet the slab before application, this could have pulled the moisture for the cement too fast causing it to check crack. could have been applied too thick also. i would find out what product they used to be sure it was correct for the application and to see if it was applied correctly. this will need to be removed and done correct before you proceed with the laminate.

Advertisement

mustangmike3789 is offline   Reply With Quote
Old 05-06-2011, 06:44 PM   #3
Newbie
 
Join Date: May 2011
Posts: 2
Rewards Points: 10
Default

Why would the cement they poured crack? In a day!


when they were putting it on they said it was cement. but it was over original hardwood.
Nosmos10 is offline   Reply With Quote
Old 05-06-2011, 07:04 PM   #4
NACE Coating Inspector
 
mustangmike3789's Avatar
 
Join Date: Apr 2011
Location: Florida
Posts: 524
Rewards Points: 500
Default

Why would the cement they poured crack? In a day!


i would find out what product they are using. if it is over hardwood, a cement product will not bond correctly and it will crack at every joint as the wood moves. i would look into a vinyl leveling compound that can be applied over properly prepared wood.
mustangmike3789 is offline   Reply With Quote
Old 05-06-2011, 09:27 PM   #5
Tileguy
 
Bud Cline's Avatar
 
Join Date: Mar 2006
Posts: 10,486
Rewards Points: 2,620
Default

Why would the cement they poured crack? In a day!


You are probably describing SLC (Self Levelling Compound).

SLC's are great and trustworthy products that perform very well. They do require the use of a primer on the substrate before they are installed. The primer retards the drying process. Most SLC's are RS (Rapid Set) and are walkable in about four hours. Small surface cracks are normal and come from surface tension that develops naturally during the quick-setting process. Not to worry.

Quote:
I think they used too much water in the mixture. Am I wrong?
It's likely you are wrong.

Don't worry.
__________________
XXX
Bud Cline is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Interior Cement Wall Crack beleazer Carpentry 7 11-22-2010 08:08 AM
Hairline crack in cement utility sink John M. Hickey Plumbing 1 06-29-2010 09:25 AM
Hairline Crack in Poured Foundation Wall handy man88 Building & Construction 3 09-08-2008 08:52 AM