taping hardibacker joints. cure time?


I have taped all the joints between my backerboards and filled gaps with thinset.

a book I have says to let cure at leasy 48 hours before laying tile. Is that necessary or can I just let dry and go? same day or next day?

I wanna do the right thing,but does it matter? any advice is appreciated.

thanks,

THB

tarheelblue is offline   Reply With Quote
Old 01-23-2010, 11:38 AM   #2
Member
 
jlhaslip's Avatar
 
Join Date: Dec 2009
Location: Canadian Rockies
Posts: 1,280
Default

taping hardibacker joints. cure time?


turn up the heat and use a fan for air circulation and it might dry quicker. The mud will change colour as it dries. Don't rush it. One day should be good

jlhaslip is offline   Reply With Quote
Old 01-23-2010, 12:18 PM   #3
Tileguy
 
JazMan's Avatar
 
Join Date: Feb 2007
Location: Troy, Michigan
Posts: 3,848
Default

taping hardibacker joints. cure time?


Where did that book come from? If it's a large area and you want to take a break, just let it set over night. Many tile setters just tape as they install the tiles. One reason to do it that way is to avoid creating speed bumps on the seams. I guess they have trouble making the tape job real thin. Did you use a wide flexible putty knife?

Jaz
__________________
Tile 4 You LLC Troy, MI

DITRA Installs - KERDI Watertight-Mold-Free Showers. I have NEVER made a mistake, I thought I did ONCE, but, I was WRONG! PRODUCT * METHOD * INSTALLATION FAILURE consultation
JazMan is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
caulking butt joints on siding downunder Building & Construction 7 11-13-2008 03:56 AM
epoxy coat and resurfacing concrete cure time questions ?? waltereo Flooring 3 10-04-2008 11:43 AM
Taping inside corners....one side at a time? yummy mummy Building & Construction 10 07-23-2008 02:23 PM
MVP4 cure time... kemerick Flooring 1 12-15-2007 12:50 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.