DIY Chatroom -  DIY Home Improvement Forum
    DIY Forum     DIY Blogs     Photos     Woodworking     Advertise     Contact Us  

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   DIY Chatroom - DIY Home Improvement Forum > Home Improvement > Flooring

Reply
 
Thread Tools Search this Thread Display Modes
Old 12-15-2012, 05:43 PM   #1
Member
 
Join Date: Dec 2011
Location: Rockville, Maryland
Posts: 61
Default

Replacing Plywood Panel in Subfloor


I'm down to the subfloor in several rooms in the home. In one room, there's one subfloor board (4'x8') that's rotten, and fortunately, doesn't run under any walls. I plan on taking it up, pulling out any remaining nails, laying down Loctite's PL subfloor glue, and then screwing a new board in its place.

Question: what's the spacing for the screws going into each joist -- every 6", every 8", every 12"?

Also, in another room, I want to get under the subfloor and don't want to damage the ceiling on the other side (way too much demolition). Can I do the same thing, except rather than putting down new plywood, simply re-lay down the old-but-good plywood?

Thanks,

Richard

RichardZ is offline   Reply With Quote
Join DIYChatroom.com

Join the #1 DIY Forum Today - It's Totally Free!

DIYChatroom.com - Are you about to start a new home improvement task and need some help? Do you need advise on what products to buy? Or maybe you can give others some advice? No matter where you fit in you'll find that DIY Chatroom is a great community to join. Best of all it's totally free.

Join DIYChatroom.com - Click Here
JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DIYChatroom.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any home improvement task!
Old 12-15-2012, 05:48 PM   #2
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 18,315
Default

Replacing Plywood Panel in Subfloor


Every 6" to be safe.
By the time you dig out the nails in the other panel it's going to be pretty tore up, just replace it.
Why does it need to come out?

joecaption is offline   Reply With Quote
Old 12-15-2012, 08:56 PM   #3
Tileguy
 
JazMan's Avatar
 
Join Date: Feb 2007
Location: Troy, Michigan
Posts: 3,265
Default

Replacing Plywood Panel in Subfloor


Subfloor plywood is t&g. Might not be easy to remove it and re-use again. Be sure to install blocking along the long sides (between joists) to compensate for no more t&g, and/or add a sheet of underlayment over the subfloor.

Jaz
__________________
Tile 4 You LLC Troy, MI
KERDI Shower Specialist ... DITRA Installs ... Product-Method suitability consultation. I have NEVER made a mistake, I thought I did once...........but I was wrong! - PRODUCTS ADVERTISED WITHIN MY POST ARE NOT ENDORSED BY ME!
JazMan is offline   Reply With Quote
Old 12-15-2012, 09:12 PM   #4
Member
 
Join Date: Dec 2011
Location: Rockville, Maryland
Posts: 61
Default

Replacing Plywood Panel in Subfloor


JoeCaption, thanks for the info. I presume 1-5/8" screws every 6" will do the trick?!?

JazMan, I only wish it was T&G. This was built 55+ years ago, so it's straight plywood. I like your idea of blocking along the long side -- I'll keep that in mind for when I come across such an instance in the future.

I will be adding underlayment, if I can every figure out exactly what that translates to. I've been told to avoid luan. Would 1/4" SandePly work? How about a 1/4" "hardwood" plywood like birch? Could I use a fiber mat?

Ultimately, the finished floor will be a loose-lay (aka, floating) sheet vinyl.

Thanks,

Richard

Last edited by RichardZ; 12-15-2012 at 09:33 PM. Reason: Add more info
RichardZ is offline   Reply With Quote
Reply


-->
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Main Service Panel to 2 breaker panels - I can imagine you all rolling your eyes kalus Electrical 22 03-23-2012 03:09 AM
new sub panel BlueBSH Electrical 11 01-22-2012 09:28 AM
Staples or screws on plywood subfloor? And other questions.... howdihi Flooring 1 08-18-2011 09:50 PM
Replacing Plywood SubFloor ... njchan Building & Construction 4 02-01-2010 05:57 PM
Information needed on replacing kitchen subfloor lyren1970 Flooring 2 07-17-2008 02:03 AM


Top of Page | View New Posts


All times are GMT -4. The time now is 06:07 PM.


© 2003 - 2010 The Building Network LLC