Remodel - Subfloor, then what?
Sheetrock, Durock, Floor Tile? or Install the complete floor with the sheetrock on top?
|
You aren't expecting an answer to a one line question like that are you? If you can't be bothered to fully explain your project and then ask a question or two, why would you think any of the pros here would bother to give you free advice that does not benefit us one bit?:no:
YICKS!! :censored: Jaz |
I installed the sub floor, does the durock and tile go down before the sheetrock goes up? or do I install the sheetrock then but the foor against it?:huh:
|
Quote:
|
Hang and finish the drywall first then rock then tile. Why would you want to mess up or cover up your floor job before the walls are done?
Were you a job super in a previous life? :confused1: |
usually sheetrock is held above the floor by about an inch. The gap is covered by base moulding.....you can do it in whatever order you want, but I agree that it is better to hang, tape and texture the sheetrock first....i would even paint first.
|