I am remodeling my bathroom. The floor is unlevel (and I also think the floor near the toilet is water damaged). My plan is to level the floor by taking up the plywood that has been put over the subfloor. I also have to replace a wall with sheet rock.
What should be done first: leveling the floor or putting up the sheet rock? The following is a pic of the floor. The forefront subfloor seems to be in good shape (though I will be able to tell more once I get the plywood off of the rest of the floor).
What should be done first: leveling the floor or putting up the sheet rock? The following is a pic of the floor. The forefront subfloor seems to be in good shape (though I will be able to tell more once I get the plywood off of the rest of the floor).